(a) The contracting officer shall provide written notification to a prospective contractor determined not responsible, which includes the basis for the determination. Notification provides the prospective contractor with the opportunity to take corrective action prior to future solicitations.
[76 FR 72328, Nov. 23, 2011]
source: 61 FR 47075, Sept. 6, 1996, unless otherwise noted.
cite as: 48 CFR 1809.105-2