§ 1730.60 - General.

Each electric program distribution borrower (as defined in § 1710.2) is responsible for establishing and maintaining a written standard policy relating to the Interconnection of Distributed Resources (IDR) having an installed capacity of not more than 10 megavolt amperes (MVA) at the point of common coupling.

authority: 7 U.S.C. 901
source: 63 FR 3450, Jan. 23, 1998, unless otherwise noted.