Section 1132(d)(1), referred to in subsec. (b)(1), was, prior to amendment of this section by Pub. L. 115–282, a reference to section 572(d)(1) of this title, which was redesignated section 572(f)(1) of this title by Pub. L. 114–120, title II, § 204(a)(1),
The date of enactment of the Coast Guard Authorization Act of 2010, referred to in subsec. (c)(3)(A), is the date of enactment of Pub. L. 111–281, which was approved
2018—Pub. L. 115–282, § 108(b), renumbered section 573 of this title as this section.
Subsec. (a). Pub. L. 115–282, § 123(b)(2), in introductory provisions, substituted “section 1131(a)(2)” for “section 571(a)(2)” and “section 1132(a)(1)” for “section 572(a)(1)”.
Subsec. (b)(1). Pub. L. 115–282, § 123(b)(2), substituted “section 1132(d)(1)” for “section 572(d)(1)”.
Subsec. (b)(3). Pub. L. 115–232, § 3522(1), substituted “ensure that independent third parties and Government employees that identify safety concerns” for “require that safety concerns identified” and “Coast Guard communicate such concerns as” for “Coast Guard shall be communicated as”.
Subsec. (b)(4). Pub. L. 115–232, § 3522(2), substituted “The Commandant shall ensure that any safety concerns that have been communicated under paragraph (3) for an acquisition program or project are reported” for “Any safety concerns that have been reported to the Chief Acquisition Officer for an acquisition program or project shall be reported by the Commandant”.
Subsec. (b)(5). Pub. L. 115–232, § 3522(3)(A), added introductory provisions and struck out former introductory provisions which read as follows: “If operational test and evaluation of a capability or asset already in low, initial, or full-rate production identifies a safety concern with the capability or asset or any subsystems of the capability or asset not previously identified during developmental or operational test and evaluation, the Commandant shall—”.
Subsec. (b)(5)(A). Pub. L. 115–232, § 3522(3)(B), inserted “the Commandant, through the Assistant Commandant for Capability, shall” before “notify”.
Subsec. (b)(5)(B). Pub. L. 115–232, § 3522(3)(C), substituted “the Deputy Commandant for Mission Support shall notify the Commandant and the Deputy Commandant for Operations of the safety concern within 50 days after the notification required under subparagraph (A), and include in such notification” for “notify the Chief Acquisition Officer and include in such notification” in introductory provisions.
Subsec. (c)(2)(A). Pub. L. 115–232, § 3522(4)(A), struck out “and that are delivered after the date of enactment of the Coast Guard Authorization Act of 2010” after “TEMPEST certification”.
Subsec. (c)(5). Pub. L. 115–232, § 3522(4)(B), struck out “and delivered after the date of enactment of the Coast Guard Authorization Act of 2010” after “acquired by the Coast Guard”.
2012—Subsec. (c)(3)(B). Pub. L. 112–213 struck out subpar. (B). Text read as follows: “Not later than
Pub. L. 115–282, title III, § 311(f),
Pub. L. 115–282, title VIII, § 818(a),