1980—Subsec. (a)(1). Pub. L. 96–294 added applicability to geothermal power producers.
For provisions requiring the Federal Energy Regulatory Commission to conduct a study and report to Congress on whether the benefits of this section and section 824a–3 of this title should be applied to hydroelectric power facilities utilizing new dams or diversions, within the meaning of section 824a–3(k) of this title, see section 8(d) of Pub. L. 99–495, set out as a note under section 824a–3 of this title.