U.S Code last checked for updates: Nov 22, 2024
§ 1311.
Effluent limitations
(a)
Illegality of pollutant discharges except in compliance with law
(b)
Timetable for achievement of objectives
In order to carry out the objective of this chapter there shall be achieved—
(1)
(A)
not later than July 1, 1977, effluent limitations for point sources, other than publicly owned treatment works, (i) which shall require the application of the best practicable control technology currently available as defined by the Administrator pursuant to section 1314(b) of this title, or (ii) in the case of a discharge into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, which shall require compliance with any applicable pretreatment requirements and any requirements under section 1317 of this title; and
(B)
for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to section 1283 of this title prior to June 30, 1974 (for which construction must be completed within four years of approval), effluent limitations based upon secondary treatment as defined by the Administrator pursuant to section 1314(d)(1) of this title; or,
(C)
not later than July 1, 1977, any more stringent limitation, including those necessary to meet water quality standards, treatment standards, or schedules of compliance, established pursuant to any State law or regulations (under authority preserved by section 1370 of this title) or any other Federal law or regulation, or required to implement any applicable water quality standard established pursuant to this chapter.
(2)
(A)
for pollutants identified in subparagraphs (C), (D), and (F) of this paragraph, effluent limitations for categories and classes of point sources, other than publicly owned treatment works, which (i) shall require application of the best available technology economically achievable for such category or class, which will result in reasonable further progress toward the national goal of eliminating the discharge of all pollutants, as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, which such effluent limitations shall require the elimination of discharges of all pollutants if the Administrator finds, on the basis of information available to him (including information developed pursuant to section 1325 of this title), that such elimination is technologically and economically achievable for a category or class of point sources as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, or (ii) in the case of the introduction of a pollutant into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, shall require compliance with any applicable pretreatment requirements and any other requirement under section 1317 of this title;
(B)
Repealed. Pub. L. 97–117, § 21(b), Dec. 29, 1981, 95 Stat. 1632.
(C)
with respect to all toxic pollutants referred to in table 1 of Committee Print Numbered 95–30 of the Committee on Public Works and Transportation of the House of Representatives compliance with effluent limitations in accordance with subparagraph (A) of this paragraph as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 1314(b) of this title, and in no case later than March 31, 1989;
(D)
for all toxic pollutants listed under paragraph (1) of subsection (a) of section 1317 of this title which are not referred to in subparagraph (C) of this paragraph compliance with effluent limitations in accordance with subparagraph (A) of this paragraph as expeditiously as practicable, but in no case later than three years after the date such limitations are promulgated under section 1314(b) of this title, and in no case later than March 31, 1989;
(E)
as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 1314(b) of this title, and in no case later than March 31, 1989, compliance with effluent limitations for categories and classes of point sources, other than publicly owned treatment works, which in the case of pollutants identified pursuant to section 1314(a)(4) of this title shall require application of the best conventional pollutant control technology as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(4) of this title; and
(F)
for all pollutants (other than those subject to subparagraphs (C), (D), or (E) of this paragraph) compliance with effluent limitations in accordance with subparagraph (A) of this paragraph as expeditiously as practicable but in no case later than 3 years after the date such limitations are established, and in no case later than March 31, 1989.
(3)
(A)
for effluent limitations under paragraph (1)(A)(i) of this subsection promulgated after January 1, 1982, and requiring a level of control substantially greater or based on fundamentally different control technology than under permits for an industrial category issued before such date, compliance as expeditiously as practicable but in no case later than three years after the date such limitations are promulgated under section 1314(b) of this title, and in no case later than March 31, 1989; and
(B)
for any effluent limitation in accordance with paragraph (1)(A)(i), (2)(A)(i), or (2)(E) of this subsection established only on the basis of section 1342(a)(1) of this title in a permit issued after February 4, 1987, compliance as expeditiously as practicable but in no case later than three years after the date such limitations are established, and in no case later than March 31, 1989.
(c)
Modification of timetable
(d)
Review and revision of effluent limitations
(e)
All point discharge source application of effluent limitations
(f)
Illegality of discharge of radiological, chemical, or biological warfare agents, high-level radioactive waste, or medical waste
(g)
Modifications for certain nonconventional pollutants
(1)
General authority
(2)
Requirements for granting modifications
A modification under this subsection shall be granted only upon a showing by the owner or operator of a point source satisfactory to the Administrator that—
(A)
such modified requirements will result at a minimum in compliance with the requirements of subsection (b)(1)(A) or (C) of this section, whichever is applicable;
(B)
such modified requirements will not result in any additional requirements on any other point or nonpoint source; and
(C)
such modification will not interfere with the attainment or maintenance of that water quality which shall assure protection of public water supplies, and the protection and propagation of a balanced population of shellfish, fish, and wildlife, and allow recreational activities, in and on the water and such modification will not result in the discharge of pollutants in quantities which may reasonably be anticipated to pose an unacceptable risk to human health or the environment because of bioaccumulation, persistency in the environment, acute toxicity, chronic toxicity (including carcinogenicity, mutagenicity or teratogenicity), or synergistic propensities.
(3)
Limitation on authority to apply for subsection (c) modification
(4)
Procedures for listing additional pollutants
(A)
General authority
(B)
Requirements for listing
(i)
Sufficient information
(ii)
Toxic criteria determination
(iii)
Listing as toxic pollutant
(iv)
Nonconventional criteria determination
(C)
Requirements for filing of petitions
A petition for listing of a pollutant under this paragraph—
(i)
must be filed not later than 270 days after the date of promulgation of an applicable effluent guideline under section 1314 of this title;
(ii)
may be filed before promulgation of such guideline; and
(iii)
may be filed with an application for a modification under paragraph (1) with respect to the discharge of such pollutant.
(D)
Deadline for approval of petition
(E)
Burden of proof
(5)
Removal of pollutants
(h)
Modification of secondary treatment requirements
The Administrator, with the concurrence of the State, may issue a permit under section 1342 of this title which modifies the requirements of subsection (b)(1)(B) of this section with respect to the discharge of any pollutant from a publicly owned treatment works into marine waters, if the applicant demonstrates to the satisfaction of the Administrator that—
(1)
there is an applicable water quality standard specific to the pollutant for which the modification is requested, which has been identified under section 1314(a)(6) of this title;
(2)
the discharge of pollutants in accordance with such modified requirements will not interfere, alone or in combination with pollutants from other sources, with the attainment or maintenance of that water quality which assures protection of public water supplies and the protection and propagation of a balanced, indigenous population of shellfish, fish, and wildlife, and allows recreational activities, in and on the water;
(3)
the applicant has established a system for monitoring the impact of such discharge on a representative sample of aquatic biota, to the extent practicable, and the scope of such monitoring is limited to include only those scientific investigations which are necessary to study the effects of the proposed discharge;
(4)
such modified requirements will not result in any additional requirements on any other point or nonpoint source;
(5)
all applicable pretreatment requirements for sources introducing waste into such treatment works will be enforced;
(6)
in the case of any treatment works serving a population of 50,000 or more, with respect to any toxic pollutant introduced into such works by an industrial discharger for which pollutant there is no applicable pretreatment requirement in effect, sources introducing waste into such works are in compliance with all applicable pretreatment requirements, the applicant will enforce such requirements, and the applicant has in effect a pretreatment program which, in combination with the treatment of discharges from such works, removes the same amount of such pollutant as would be removed if such works were to apply secondary treatment to discharges and if such works had no pretreatment program with respect to such pollutant;
(7)
to the extent practicable, the applicant has established a schedule of activities designed to eliminate the entrance of toxic pollutants from nonindustrial sources into such treatment works;
(8)
there will be no new or substantially increased discharges from the point source of the pollutant to which the modification applies above that volume of discharge specified in the permit;
(9)
the applicant at the time such modification becomes effective will be discharging effluent which has received at least primary or equivalent treatment and which meets the criteria established under section 1314(a)(1) of this title after initial mixing in the waters surrounding or adjacent to the point at which such effluent is discharged.
For the purposes of this subsection the phrase “the discharge of any pollutant into marine waters” refers to a discharge into deep waters of the territorial sea or the waters of the contiguous zone, or into saline estuarine waters where there is strong tidal movement and other hydrological and geological characteristics which the Administrator determines necessary to allow compliance with paragraph (2) of this subsection, and section 1251(a)(2) of this title. For the purposes of paragraph (9), “primary or equivalent treatment” means treatment by screening, sedimentation, and skimming adequate to remove at least 30 percent of the biological oxygen demanding material and of the suspended solids in the treatment works influent, and disinfection, where appropriate. A municipality which applies secondary treatment shall be eligible to receive a permit pursuant to this subsection which modifies the requirements of subsection (b)(1)(B) of this section with respect to the discharge of any pollutant from any treatment works owned by such municipality into marine waters. No permit issued under this subsection shall authorize the discharge of sewage sludge into marine waters. In order for a permit to be issued under this subsection for the discharge of a pollutant into marine waters, such marine waters must exhibit characteristics assuring that water providing dilution does not contain significant amounts of previously discharged effluent from such treatment works. No permit issued under this subsection shall authorize the discharge of any pollutant into saline estuarine waters which at the time of application do not support a balanced indigenous population of shellfish, fish and wildlife, or allow recreation in and on the waters or which exhibit ambient water quality below applicable water quality standards adopted for the protection of public water supplies, shellfish, fish and wildlife or recreational activities or such other standards necessary to assure support and protection of such uses. The prohibition contained in the
(i)
Municipal time extensions
(1)
Where construction is required in order for a planned or existing publicly owned treatment works to achieve limitations under subsection (b)(1)(B) or (b)(1)(C) of this section, but (A) construction cannot be completed within the time required in such subsection, or (B) the United States has failed to make financial assistance under this chapter available in time to achieve such limitations by the time specified in such subsection, the owner or operator of such treatment works may request the Administrator (or if appropriate the State) to issue a permit pursuant to section 1342 of this title or to modify a permit issued pursuant to that section to extend such time for compliance. Any such request shall be filed with the Administrator (or if appropriate the State) within 180 days after February 4, 1987. The Administrator (or if appropriate the State) may grant such request and issue or modify such a permit, which shall contain a schedule of compliance for the publicly owned treatment works based on the earliest date by which such financial assistance will be available from the United States and construction can be completed, but in no event later than July 1, 1988, and shall contain such other terms and conditions, including those necessary to carry out subsections (b) through (g) of section 1281 of this title, section 1317 of this title, and such interim effluent limitations applicable to that treatment works as the Administrator determines are necessary to carry out the provisions of this chapter.
(2)
(A)
Where a point source (other than a publicly owned treatment works) will not achieve the requirements of subsections (b)(1)(A) and (b)(1)(C) of this section and—
(i)
if a permit issued prior to July 1, 1977, to such point source is based upon a discharge into a publicly owned treatment works; or
(ii)
if such point source (other than a publicly owned treatment works) had before July 1, 1977, a contract (enforceable against such point source) to discharge into a publicly owned treatment works; or
(iii)
if either an application made before July 1, 1977, for a construction grant under this chapter for a publicly owned treatment works, or engineering or architectural plans or working drawings made before July 1, 1977, for a publicly owned treatment works, show that such point source was to discharge into such publicly owned treatment works,
and such publicly owned treatment works is presently unable to accept such discharge without construction, and in the case of a discharge to an existing publicly owned treatment works, such treatment works has an extension pursuant to paragraph (1) of this subsection, the owner or operator of such point source may request the Administrator (or if appropriate the State) to issue or modify such a permit pursuant to such section 1342 of this title to extend such time for compliance. Any such request shall be filed with the Administrator (or if appropriate the State) within 180 days after December 27, 1977, or the filing of a request by the appropriate publicly owned treatment works under paragraph (1) of this subsection, whichever is later. If the Administrator (or if appropriate the State) finds that the owner or operator of such point source has acted in good faith, he may grant such request and issue or modify such a permit, which shall contain a schedule of compliance for the point source to achieve the requirements of subsections (b)(1)(A) and (C) of this section and shall contain such other terms and conditions, including pretreatment and interim effluent limitations and water conservation requirements applicable to that point source, as the Administrator determines are necessary to carry out the provisions of this chapter.
(B)
No time modification granted by the Administrator (or if appropriate the State) pursuant to paragraph (2)(A) of this subsection shall extend beyond the earliest date practicable for compliance or beyond the date of any extension granted to the appropriate publicly owned treatment works pursuant to paragraph (1) of this subsection, but in no event shall it extend beyond July 1, 1988; and no such time modification shall be granted unless (i) the publicly owned treatment works will be in operation and available to the point source before July 1, 1988, and will meet the requirements of subsections (b)(1)(B) and (C) of this section after receiving the discharge from that point source; and (ii) the point source and the publicly owned treatment works have entered into an enforceable contract requiring the point source to discharge into the publicly owned treatment works, the owner or operator of such point source to pay the costs required under section 1284 of this title, and the publicly owned treatment works to accept the discharge from the point source; and (iii) the permit for such point source requires that point source to meet all requirements under section 1317(a) and (b) of this title during the period of such time modification.
(j)
Modification procedures
(1)
Any application filed under this section for a modification of the provisions of—
(A)
subsection (b)(1)(B) under subsection (h) of this section shall be filed not later that 1
1
 So in original. Probably should be “than”.
the 365th day which begins after December 29, 1981, except that a publicly owned treatment works which prior to December 31, 1982, had a contractual arrangement to use a portion of the capacity of an ocean outfall operated by another publicly owned treatment works which has applied for or received modification under subsection (h), may apply for a modification of subsection (h) in its own right not later than 30 days after February 4, 1987, and except as provided in paragraph (5);
(B)
subsection (b)(2)(A) as it applies to pollutants identified in subsection (b)(2)(F) shall be filed not later than 270 days after the date of promulgation of an applicable effluent guideline under section 1314 of this title or not later than 270 days after December 27, 1977, whichever is later.
(2)
Subject to paragraph (3) of this section, any application for a modification filed under subsection (g) of this section shall not operate to stay any requirement under this chapter, unless in the judgment of the Administrator such a stay or the modification sought will not result in the discharge of pollutants in quantities which may reasonably be anticipated to pose an unacceptable risk to human health or the environment because of bioaccumulation, persistency in the environment, acute toxicity, chronic toxicity (including carcinogenic­ity, mutagenicity, or teratogenicity), or synergistic propensities, and that there is a substantial likelihood that the applicant will succeed on the merits of such application. In the case of an application filed under subsection (g) of this section, the Administrator may condition any stay granted under this paragraph on requiring the filing of a bond or other appropriate security to assure timely compliance with the requirements from which a modification is sought.
(3)
Compliance requirements under subsection (g).—
(A)
Effect of filing.—
An application for a modification under subsection (g) and a petition for listing of a pollutant as a pollutant for which modifications are authorized under such subsection shall not stay the requirement that the person seeking such modification or listing comply with effluent limitations under this chapter for all pollutants not the subject of such application or petition.
(B)
Effect of disapproval.—
Disapproval of an application for a modification under subsection (g) shall not stay the requirement that the person seeking such modification comply with all applicable effluent limitations under this chapter.
(4)
Deadline for subsection (g) decision.—
An application for a modification with respect to a pollutant filed under subsection (g) must be approved or disapproved not later than 365 days after the date of such filing; except that in any case in which a petition for listing such pollutant as a pollutant for which modifications are authorized under such subsection is approved, such application must be approved or disapproved not later than 365 days after the date of approval of such petition.
(5)
Extension of application deadline.—
(A)
In general.—
In the 180-day period beginning on October 31, 1994, the city of San Diego, California, may apply for a modification pursuant to subsection (h) of the requirements of subsection (b)(1)(B) with respect to biological oxygen demand and total suspended solids in the effluent discharged into marine waters.
(B)
Application.—
An application under this paragraph shall include a commitment by the applicant to implement a waste water reclamation program that, at a minimum, will—
(i)
achieve a system capacity of 45,000,000 gallons of reclaimed waste water per day by January 1, 2010; and
(ii)
result in a reduction in the quantity of suspended solids discharged by the applicant into the marine environment during the period of the modification.
(C)
Additional conditions.—
The Administrator may not grant a modification pursuant to an application submitted under this paragraph unless the Administrator determines that such modification will result in removal of not less than 58 percent of the biological oxygen demand (on an annual average) and not less than 80 percent of total suspended solids (on a monthly average) in the discharge to which the application applies.
(D)
Preliminary decision deadline.—
The Administrator shall announce a preliminary decision on an application submitted under this paragraph not later than 1 year after the date the application is submitted.
(k)
Innovative technology
(l)
Toxic pollutants
(m)
Modification of effluent limitation requirements for point sources
(1)
The Administrator, with the concurrence of the State, may issue a permit under section 1342 of this title which modifies the requirements of subsections (b)(1)(A) and (b)(2)(E) of this section, and of section 1343 of this title, with respect to effluent limitations to the extent such limitations relate to biochemical oxygen demand and pH from discharges by an industrial discharger in such State into deep waters of the territorial seas, if the applicant demonstrates and the Administrator finds that—
(A)
the facility for which modification is sought is covered at the time of the enactment of this subsection by National Pollutant Discharge Elimination System permit number CA0005894 or CA0005282;
(B)
the energy and environmental costs of meeting such requirements of subsections (b)(1)(A) and (b)(2)(E) and section 1343 of this title exceed by an unreasonable amount the benefits to be obtained, including the objectives of this chapter;
(C)
the applicant has established a system for monitoring the impact of such discharges on a representative sample of aquatic biota;
(D)
such modified requirements will not result in any additional requirements on any other point or nonpoint source;
(E)
there will be no new or substantially increased discharges from the point source of the pollutant to which the modification applies above that volume of discharge specified in the permit;
(F)
the discharge is into waters where there is strong tidal movement and other hydrological and geological characteristics which are necessary to allow compliance with this subsection and section 1251(a)(2) of this title;
(G)
the applicant accepts as a condition to the permit a contractural 2
2
 So in original. Probably should be “contractual”.
obligation to use funds in the amount required (but not less than $250,000 per year for ten years) for research and development of water pollution control technology, including but not limited to closed cycle technology;
(H)
the facts and circumstances present a unique situation which, if relief is granted, will not establish a precedent or the relaxation of the requirements of this chapter applicable to similarly situated discharges; and
(I)
no owner or operator of a facility comparable to that of the applicant situated in the United States has demonstrated that it would be put at a competitive disadvantage to the applicant (or the parent company or any subsidiary thereof) as a result of the issuance of a permit under this subsection.
(2)
The effluent limitations established under a permit issued under paragraph (1) shall be sufficient to implement the applicable State water quality standards, to assure the protection of public water supplies and protection and propagation of a balanced, indigenous population of shellfish, fish, fauna, wildlife, and other aquatic organisms, and to allow recreational activities in and on the water. In setting such limitations, the Administrator shall take into account any seasonal variations and the need for an adequate margin of safety, considering the lack of essential knowledge concerning the relationship between effluent limitations and water quality and the lack of essential knowledge of the effects of discharges on beneficial uses of the receiving waters.
(3)
A permit under this subsection may be issued for a period not to exceed five years, and such a permit may be renewed for one additional period not to exceed five years upon a demonstration by the applicant and a finding by the Administrator at the time of application for any such renewal that the provisions of this subsection are met.
(4)
The Administrator may terminate a permit issued under this subsection if the Administrator determines that there has been a decline in ambient water quality of the receiving waters during the period of the permit even if a direct cause and effect relationship cannot be shown: Provided, That if the effluent from a source with a permit issued under this subsection is contributing to a decline in ambient water quality of the receiving waters, the Administrator shall terminate such permit.
(n)
Fundamentally different factors
(1)
General rule
The Administrator, with the concurrence of the State, may establish an alternative requirement under subsection (b)(2) or section 1317(b) of this title for a facility that modifies the requirements of national effluent limitation guidelines or categorical pretreatment standards that would otherwise be applicable to such facility, if the owner or operator of such facility demonstrates to the satisfaction of the Administrator that—
(A)
the facility is fundamentally different with respect to the factors (other than cost) specified in section 1314(b) or 1314(g) of this title and considered by the Administrator in establishing such national effluent limitation guidelines or categorical pretreatment standards;
(B)
the application—
(i)
is based solely on information and supporting data submitted to the Administrator during the rulemaking for establishment of the applicable national effluent limitation guidelines or categorical pretreatment standard specifically raising the factors that are fundamentally different for such facility; or
(ii)
is based on information and supporting data referred to in clause (i) and information and supporting data the applicant did not have a reasonable opportunity to submit during such rulemaking;
(C)
the alternative requirement is no less stringent than justified by the fundamental difference; and
(D)
the alternative requirement will not result in a non-water quality environmental impact which is markedly more adverse than the impact considered by the Administrator in establishing such national effluent limitation guideline or categorical pretreatment standard.
(2)
Time limit for applications
(3)
Time limit for decision
(4)
Submission of information
(5)
Treatment of pending applications
(6)
Effect of submission of application
(7)
Effect of denial
(8)
Reports
(o)
Application fees
(p)
Modified permit for coal remining operations
(1)
In general
(2)
Limitations
(3)
Definitions
For purposes of this subsection—
(A)
Coal remining operation
(B)
Remined area
(C)
Pre-existing discharge
(4)
Applicability of strip mining laws
(June 30, 1948, ch. 758, title III, § 301, as added Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 844; amended Pub. L. 95–217, §§ 42–47, 53(c), Dec. 27, 1977, 91 Stat. 1582–1586, 1590; Pub. L. 97–117, §§ 21, 22(a)–(d), Dec. 29, 1981, 95 Stat. 1631, 1632; Pub. L. 97–440, Jan. 8, 1983, 96 Stat. 2289; Pub. L. 100–4, title III, §§ 301(a)–(e), 302(a)–(d), 303(a), (b)(1), (c)–(f), 304(a), 305, 306(a), (b), 307, Feb. 4, 1987, 101 Stat. 29–37; Pub. L. 100–688, title III, § 3202(b), Nov. 18, 1988, 102 Stat. 4154; Pub. L. 103–431, § 2, Oct. 31, 1994, 108 Stat. 4396; Pub. L. 104–66, title II, § 2021(b), Dec. 21, 1995, 109 Stat. 727.)
cite as: 33 USC 1311