Notwithstanding the second sentence of paragraph (1) of this subsection, the Administrator shall make a preliminary detailed estimate called for by subparagraph (B) of such paragraph and shall submit such preliminary detailed estimate to the Congress no later than
September 3, 1974. The Administrator shall require each State to prepare an estimate of cost for such State, and shall utilize the survey form EPA–1, O.M.B. No. 158–R0017, prepared for the 1973 detailed estimate, except that such estimate shall include all costs of compliance with
section 1281(g)(2)(A) of this title and water quality standards established pursuant to
section 1313 of this title, and all costs of treatment works as defined in
section 1292(2) of this title, including all eligible costs of constructing sewage collection systems and correcting excessive infiltration or inflow and all eligible costs of correcting combined storm and sanitary sewer problems and treating storm water flows. The survey form shall be distributed by the Administrator to each State no later than
January 31, 1974.