U.S Code last checked for updates: Nov 22, 2024
§ 7410.
State implementation plans for national primary and secondary ambient air quality standards
(a)
Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems
(1)
Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under section 7409 of this title for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph.
(2)
Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall—
(A)
include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permits, and auctions of emissions rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to meet the applicable requirements of this chapter;
(B)
provide for establishment and operation of appropriate devices, methods, systems, and procedures necessary to—
(i)
monitor, compile, and analyze data on ambient air quality, and
(ii)
upon request, make such data available to the Administrator;
(C)
include a program to provide for the enforcement of the measures described in subparagraph (A), and regulation of the modification and construction of any stationary source within the areas covered by the plan as necessary to assure that national ambient air quality standards are achieved, including a permit program as required in parts C and D;
(D)
contain adequate provisions—
(i)
prohibiting, consistent with the provisions of this subchapter, any source or other type of emissions activity within the State from emitting any air pollutant in amounts which will—
(I)
contribute significantly to nonattainment in, or interfere with maintenance by, any other State with respect to any such national primary or secondary ambient air quality standard, or
(II)
interfere with measures required to be included in the applicable implementation plan for any other State under part C to prevent significant deterioration of air quality or to protect visibility,
(ii)
insuring compliance with the applicable requirements of sections 7426 and 7415 of this title (relating to interstate and international pollution abatement);
(E)
provide (i) necessary assurances that the State (or, except where the Administrator deems inappropriate, the general purpose local government or governments, or a regional agency designated by the State or general purpose local governments for such purpose) will have adequate personnel, funding, and authority under State (and, as appropriate, local) law to carry out such implementation plan (and is not prohibited by any provision of Federal or State law from carrying out such implementation plan or portion thereof), (ii) requirements that the State comply with the requirements respecting State boards under section 7428 of this title, and (iii) necessary assurances that, where the State has relied on a local or regional government, agency, or instrumentality for the implementation of any plan provision, the State has responsibility for ensuring adequate implementation of such plan provision;
(F)
require, as may be prescribed by the Administrator—
(i)
the installation, maintenance, and replacement of equipment, and the implementation of other necessary steps, by owners or operators of stationary sources to monitor emissions from such sources,
(ii)
periodic reports on the nature and amounts of emissions and emissions-related data from such sources, and
(iii)
correlation of such reports by the State agency with any emission limitations or standards established pursuant to this chapter, which reports shall be available at reasonable times for public inspection;
(G)
provide for authority comparable to that in section 7603 of this title and adequate contingency plans to implement such authority;
(H)
provide for revision of such plan—
(i)
from time to time as may be necessary to take account of revisions of such national primary or secondary ambient air quality standard or the availability of improved or more expeditious methods of attaining such standard, and
(ii)
except as provided in paragraph (3)(C), whenever the Administrator finds on the basis of information available to the Administrator that the plan is substantially inadequate to attain the national ambient air quality standard which it implements or to otherwise comply with any additional requirements established under this chapter;
(I)
in the case of a plan or plan revision for an area designated as a nonattainment area, meet the applicable requirements of part D (relating to nonattainment areas);
(J)
meet the applicable requirements of section 7421 of this title (relating to consultation), section 7427 of this title (relating to public notification), and part C (relating to prevention of significant deterioration of air quality and visibility protection);
(K)
provide for—
(i)
the performance of such air quality modeling as the Administrator may prescribe for the purpose of predicting the effect on ambient air quality of any emissions of any air pollutant for which the Administrator has established a national ambient air quality standard, and
(ii)
the submission, upon request, of data related to such air quality modeling to the Administrator;
(L)
require the owner or operator of each major stationary source to pay to the permitting authority, as a condition of any permit required under this chapter, a fee sufficient to cover—
(i)
the reasonable costs of reviewing and acting upon any application for such a permit, and
(ii)
if the owner or operator receives a permit for such source, the reasonable costs of implementing and enforcing the terms and conditions of any such permit (not including any court costs or other costs associated with any enforcement action),
until such fee requirement is superseded with respect to such sources by the Administrator’s approval of a fee program under subchapter V; and
(M)
provide for consultation and participation by local political subdivisions affected by the plan.
(3)
(A)
Repealed. Pub. L. 101–549, title I, § 101(d)(1), Nov. 15, 1990, 104 Stat. 2409.
(B)
As soon as practicable, the Administrator shall, consistent with the purposes of this chapter and the Energy Supply and Environmental Coordination Act of 1974 [15 U.S.C. 791 et seq.], review each State’s applicable implementation plans and report to the State on whether such plans can be revised in relation to fuel burning stationary sources (or persons supplying fuel to such sources) without interfering with the attainment and maintenance of any national ambient air quality standard within the period permitted in this section. If the Administrator determines that any such plan can be revised, he shall notify the State that a plan revision may be submitted by the State. Any plan revision which is submitted by the State shall, after public notice and opportunity for public hearing, be approved by the Administrator if the revision relates only to fuel burning stationary sources (or persons supplying fuel to such sources), and the plan as revised complies with paragraph (2) of this subsection. The Administrator shall approve or disapprove any revision no later than three months after its submission.
(C)
Neither the State, in the case of a plan (or portion thereof) approved under this subsection, nor the Administrator, in the case of a plan (or portion thereof) promulgated under subsection (c), shall be required to revise an applicable implementation plan because one or more exemptions under section 7418 of this title (relating to Federal facilities), enforcement orders under section 7413(d) 1
1
 See References in Text note below.
of this title, suspensions under subsection (f) or (g) (relating to temporary energy or economic authority), orders under section 7419 of this title (relating to primary nonferrous smelters), or extensions of compliance in decrees entered under section 7413(e) 1 of this title (relating to iron- and steel-producing operations) have been granted, if such plan would have met the requirements of this section if no such exemptions, orders, or extensions had been granted.
(4)
Repealed. Pub. L. 101–549, title I, § 101(d)(2), Nov. 15, 1990, 104 Stat. 2409.
(5)
(A)
(i)
Any State may include in a State implementation plan, but the Administrator may not require as a condition of approval of such plan under this section, any indirect source review program. The Administrator may approve and enforce, as part of an applicable implementation plan, an indirect source review program which the State chooses to adopt and submit as part of its plan.
(ii)
Except as provided in subparagraph (B), no plan promulgated by the Administrator shall include any indirect source review program for any air quality control region, or portion thereof.
(iii)
Any State may revise an applicable implementation plan approved under this subsection to suspend or revoke any such program included in such plan, provided that such plan meets the requirements of this section.
(B)
The Administrator shall have the authority to promulgate, implement and enforce regulations under subsection (c) respecting indirect source review programs which apply only to federally assisted highways, airports, and other major federally assisted indirect sources and federally owned or operated indirect sources.
(C)
For purposes of this paragraph, the term “indirect source” means a facility, building, structure, installation, real property, road, or highway which attracts, or may attract, mobile sources of pollution. Such term includes parking lots, parking garages, and other facilities subject to any measure for management of parking supply (within the meaning of subsection (c)(2)(D)(ii)), including regulation of existing off-street parking but such term does not include new or existing on-street parking. Direct emissions sources or facilities at, within, or associated with, any indirect source shall not be deemed indirect sources for the purpose of this paragraph.
(D)
For purposes of this paragraph the term “indirect source review program” means the facility-by-facility review of indirect sources of air pollution, including such measures as are necessary to assure, or assist in assuring, that a new or modified indirect source will not attract mobile sources of air pollution, the emissions from which would cause or contribute to air pollution concentrations—
(i)
exceeding any national primary ambient air quality standard for a mobile source-related air pollutant after the primary standard attainment date, or
(ii)
preventing maintenance of any such standard after such date.
(E)
For purposes of this paragraph and paragraph (2)(B), the term “transportation control measure” does not include any measure which is an “indirect source review program”.
(6)
No State plan shall be treated as meeting the requirements of this section unless such plan provides that in the case of any source which uses a supplemental, or intermittent control system for purposes of meeting the requirements of an order under section 7413(d) 1 of this title or section 7419 of this title (relating to primary nonferrous smelter orders), the owner or operator of such source may not temporarily reduce the pay of any employee by reason of the use of such supplemental or intermittent or other dispersion dependent control system.
(b)
Extension of period for submission of plans
(c)
Preparation and publication by Administrator of proposed regulations setting forth implementation plan; transportation regulations study and report; parking surcharge; suspension authority; plan implementation
(1)
The Administrator shall promulgate a Federal implementation plan at any time within 2 years after the Administrator—
(A)
finds that a State has failed to make a required submission or finds that the plan or plan revision submitted by the State does not satisfy the minimum criteria established under subsection (k)(1)(A), or
(B)
disapproves a State implementation plan submission in whole or in part,
unless the State corrects the deficiency, and the Administrator approves the plan or plan revision, before the Administrator promulgates such Federal implementation plan.
(2)
(A)
Repealed. Pub. L. 101–549, title I, § 101(d)(3)(A), Nov. 15, 1990, 104 Stat. 2409.
(B)
No parking surcharge regulation may be required by the Administrator under paragraph (1) of this subsection as a part of an applicable implementation plan. All parking surcharge regulations previously required by the Administrator shall be void upon June 22, 1974. This subparagraph shall not prevent the Administrator from approving parking surcharges if they are adopted and submitted by a State as part of an applicable implementation plan. The Administrator may not condition approval of any implementation plan submitted by a State on such plan’s including a parking surcharge regulation.
(C)
Repealed. Pub. L. 101–549, title I, § 101(d)(3)(B), Nov. 15, 1990, 104 Stat. 2409.
(D)
For purposes of this paragraph—
(i)
The term “parking surcharge regulation” means a regulation imposing or requiring the imposition of any tax, surcharge, fee, or other charge on parking spaces, or any other area used for the temporary storage of motor vehicles.
(ii)
The term “management of parking supply” shall include any requirement providing that any new facility containing a given number of parking spaces shall receive a permit or other prior approval, issuance of which is to be conditioned on air quality considerations.
(iii)
The term “preferential bus/carpool lane” shall include any requirement for the setting aside of one or more lanes of a street or highway on a permanent or temporary basis for the exclusive use of buses or carpools, or both.
(E)
No standard, plan, or requirement, relating to management of parking supply or preferential bus/carpool lanes shall be promulgated after June 22, 1974, by the Administrator pursuant to this section, unless such promulgation has been subjected to at least one public hearing which has been held in the area affected and for which reasonable notice has been given in such area. If substantial changes are made following public hearings, one or more additional hearings shall be held in such area after such notice.
(3)
Upon application of the chief executive officer of any general purpose unit of local government, if the Administrator determines that such unit has adequate authority under State or local law, the Administrator may delegate to such unit the authority to implement and enforce within the jurisdiction of such unit any part of a plan promulgated under this subsection. Nothing in this paragraph shall prevent the Administrator from implementing or enforcing any applicable provision of a plan promulgated under this subsection.
(4)
Repealed. Pub. L. 101–549, title I, § 101(d)(3)(C), Nov. 15, 1990, 104 Stat. 2409.
(5)
(A)
Any measure in an applicable implementation plan which requires a toll or other charge for the use of a bridge located entirely within one city shall be eliminated from such plan by the Administrator upon application by the Governor of the State, which application shall include a certification by the Governor that he will revise such plan in accordance with subparagraph (B).
(B)
In the case of any applicable implementation plan with respect to which a measure has been eliminated under subparagraph (A), such plan shall, not later than one year after August 7, 1977, be revised to include comprehensive measures to:
(i)
establish, expand, or improve public transportation measures to meet basic transportation needs, as expeditiously as is practicable; and
(ii)
implement transportation control measures necessary to attain and maintain national ambient air quality standards,
and such revised plan shall, for the purpose of implementing such comprehensive public transportation measures, include requirements to use (insofar as is necessary) Federal grants, State or local funds, or any combination of such grants and funds as may be consistent with the terms of the legislation providing such grants and funds. Such measures shall, as a substitute for the tolls or charges eliminated under subparagraph (A), provide for emissions reductions equivalent to the reductions which may reasonably be expected to be achieved through the use of the tolls or charges eliminated.
(C)
Any revision of an implementation plan for purposes of meeting the requirements of subparagraph (B) shall be submitted in coordination with any plan revision required under part D.
(d)
, (e) Repealed. Pub. L. 101–549, title I, § 101(d)(4), (5), Nov. 15, 1990, 104 Stat. 2409
(f)
National or regional energy emergencies; determination by President
(1)
Upon application by the owner or operator of a fuel burning stationary source, and after notice and opportunity for public hearing, the Governor of the State in which such source is located may petition the President to determine that a national or regional energy emergency exists of such severity that—
(A)
a temporary suspension of any part of the applicable implementation plan or of any requirement under section 7651j of this title (concerning excess emissions penalties or offsets) may be necessary, and
(B)
other means of responding to the energy emergency may be inadequate.
Such determination shall not be delegable by the President to any other person. If the President determines that a national or regional energy emergency of such severity exists, a temporary emergency suspension of any part of an applicable implementation plan or of any requirement under section 7651j of this title (concerning excess emissions penalties or offsets) adopted by the State may be issued by the Governor of any State covered by the President’s determination under the condition specified in paragraph (2) and may take effect immediately.
(2)
A temporary emergency suspension under this subsection shall be issued to a source only if the Governor of such State finds that—
(A)
there exists in the vicinity of such source a temporary energy emergency involving high levels of unemployment or loss of necessary energy supplies for residential dwellings; and
(B)
such unemployment or loss can be totally or partially alleviated by such emergency suspension.
Not more than one such suspension may be issued for any source on the basis of the same set of circumstances or on the basis of the same emergency.
(3)
A temporary emergency suspension issued by a Governor under this subsection shall remain in effect for a maximum of four months or such lesser period as may be specified in a disapproval order of the Administrator, if any. The Administrator may disapprove such suspension if he determines that it does not meet the requirements of paragraph (2).
(4)
This subsection shall not apply in the case of a plan provision or requirement promulgated by the Administrator under subsection (c) of this section, but in any such case the President may grant a temporary emergency suspension for a four month period of any such provision or requirement if he makes the determinations and findings specified in paragraphs (1) and (2).
(5)
The Governor may include in any temporary emergency suspension issued under this subsection a provision delaying for a period identical to the period of such suspension any compliance schedule (or increment of progress) to which such source is subject under section 1857c–10 1 of this title, as in effect before August 7, 1977, or section 7413(d) 1 of this title, upon a finding that such source is unable to comply with such schedule (or increment) solely because of the conditions on the basis of which a suspension was issued under this subsection.
(g)
Governor’s authority to issue temporary emergency suspensions
(1)
In the case of any State which has adopted and submitted to the Administrator a proposed plan revision which the State determines—
(A)
meets the requirements of this section, and
(B)
is necessary (i) to prevent the closing for one year or more of any source of air pollution, and (ii) to prevent substantial increases in unemployment which would result from such closing, and
which the Administrator has not approved or disapproved under this section within 12 months of submission of the proposed plan revision, the Governor may issue a temporary emergency suspension of the part of the applicable implementation plan for such State which is proposed to be revised with respect to such source. The determination under subparagraph (B) may not be made with respect to a source which would close without regard to whether or not the proposed plan revision is approved.
(2)
A temporary emergency suspension issued by a Governor under this subsection shall remain in effect for a maximum of four months or such lesser period as may be specified in a disapproval order of the Administrator. The Administrator may disapprove such suspension if he determines that it does not meet the requirements of this subsection.
(3)
The Governor may include in any temporary emergency suspension issued under this subsection a provision delaying for a period identical to the period of such suspension any compliance schedule (or increment of progress) to which such source is subject under section 1857c–10 1 of this title as in effect before August 7, 1977, or under section 7413(d) 1 of this title upon a finding that such source is unable to comply with such schedule (or increment) solely because of the conditions on the basis of which a suspension was issued under this subsection.
(h)
Publication of comprehensive document for each State setting forth requirements of applicable implementation plan
(1)
Not later than 5 years after November 15, 1990, and every 3 years thereafter, the Administrator shall assemble and publish a comprehensive document for each State setting forth all requirements of the applicable implementation plan for such State and shall publish notice in the Federal Register of the availability of such documents.
(2)
The Administrator may promulgate such regulations as may be reasonably necessary to carry out the purpose of this subsection.
(i)
Modification of requirements prohibited
(j)
Technological systems of continuous emission reduction on new or modified stationary sources; compliance with performance standards
(k)
Environmental Protection Agency action on plan submissions
(1)
Completeness of plan submissions
(A)
Completeness criteria
(B)
Completeness finding
(C)
Effect of finding of incompleteness
(2)
Deadline for action
(3)
Full and partial approval and disapproval
(4)
Conditional approval
(5)
Calls for plan revisions
(6)
Corrections
(l)
Plan revisions
(m)
Sanctions
(n)
Savings clauses
(1)
Existing plan provisions
(2)
Attainment dates
For any area not designated nonattainment, any plan or plan revision submitted or required to be submitted by a State—
(A)
in response to the promulgation or revision of a national primary ambient air quality standard in effect on November 15, 1990, or
(B)
in response to a finding of substantial inadequacy under subsection (a)(2) (as in effect immediately before November 15, 1990),
shall provide for attainment of the national primary ambient air quality standards within 3 years of November 15, 1990, or within 5 years of issuance of such finding of substantial inadequacy, whichever is later.
(3)
Retention of construction moratorium in certain areas
(o)
Indian tribes
(p)
Reports
(July 14, 1955, ch. 360, title I, § 110, as added Pub. L. 91–604, § 4(a), Dec. 31, 1970, 84 Stat. 1680; amended Pub. L. 93–319, § 4, June 22, 1974, 88 Stat. 256; Pub. L. 95–95, title I, §§ 107, 108, Aug. 7, 1977, 91 Stat. 691, 693; Pub. L. 95–190, § 14(a)(1)–(6), Nov. 16, 1977, 91 Stat. 1399; Pub. L. 97–23, § 3, July 17, 1981, 95 Stat. 142; Pub. L. 101–549, title I, §§ 101(b)–(d), 102(h), 107(c), 108(d), title IV, § 412, Nov. 15, 1990, 104 Stat. 2404–2408, 2422, 2464, 2466, 2634.)
cite as: 42 USC 7410