2014—Pub. L. 113–79 struck out subsec. (a) designation and heading before “To the maximum” and struck out subsec. (b) which required a report to Congress regarding efforts to improve procurement planning not later than 90 days after
2008—Pub. L. 110–246 designated existing provisions as subsec. (a), inserted heading, and added subsec. (b).
1996—Pub. L. 104–127 substituted “subchapter III–A” for “this chapter” in two places.
1990—Pub. L. 101–624 amended section generally, substituting present provisions for provisions requiring, to maximum extent practicable, availability of commodities on multiyear basis.
Amendment by Pub. L. 110–246 effective
Amendment by Pub. L. 101–624 effective
Section effective