U.S. CODE
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
CustomsMobile Pro
beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
SIGNUP FOR BETA
SEARCH
Toggle Dropdown
Search US Code
Search Leg. Notes
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
U.S Code last checked for updates: Nov 22, 2024
All Titles
Title 16
Chapter 1
Subchapter LXIX
Part C
§ 460l-20. Construction of proje...
Part D - Land Transfers...
§ 460l-20. Construction of proje...
Part D - Land Transfers...
U.S. Code
Notes
§ 460l–21.
Definitions
As used in this part:
(a)
The term “project” shall mean a project or any appropriate unit thereof.
(b)
The term “separable costs,” as applied to any project purpose, means the difference between the capital cost of the entire multiple-purpose project and the capital cost of the project with the purpose omitted.
(c)
The term “joint costs” means the difference between the capital cost of the entire multiple-purpose project and the sum of the separable costs for all project purposes.
(d)
The term “feasibility report” shall mean any report of the scope required by the Congress when formally considering authorization of the project of which the report treats.
(e)
The term “capital cost” includes interest during construction, wherever appropriate.
(
Pub. L. 89–72, § 10
,
July 9, 1965
,
79 Stat. 218
.)
cite as:
16 USC 460l-21
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
Get the CustomsMobile app!