U.S. CODE
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
CustomsMobile Pro
beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
SIGNUP FOR BETA
SEARCH
Toggle Dropdown
Search US Code
Search Leg. Notes
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
U.S Code last checked for updates: Nov 22, 2024
All Titles
Title 33
Chapter 36
Subchapter V
§ 2330. Aquatic ecosystem restor...
§ 2330b. Fish hatcheries...
§ 2330. Aquatic ecosystem restor...
§ 2330b. Fish hatcheries...
U.S. Code
Notes
§ 2330a.
Monitoring ecosystem restoration
(a)
In general
(b)
Monitoring plan
The monitoring plan shall—
(1)
include a description of the monitoring activities to be carried out, the criteria for ecosystem restoration success, and the estimated cost and duration of the monitoring; and
(2)
specify that the monitoring shall continue until such time as the Secretary determines that the criteria for ecosystem restoration success will be met.
(c)
Cost share
(d)
Inclusions
A monitoring plan under subsection (b) shall include a description of—
(1)
the types and number of restoration activities to be conducted;
(2)
the physical action to be undertaken to achieve the restoration objectives of the project;
(3)
the functions and values that will result from the restoration plan; and
(4)
a contingency plan for taking corrective actions in cases in which monitoring demonstrates that restoration measures are not achieving ecological success in accordance with criteria described in the monitoring plan.
(e)
Conclusion of operation and maintenance responsibility
(f)
Federal obligations
(
Pub. L. 110–114, title II, § 2039
,
Nov. 8, 2007
,
121 Stat. 1100
;
Pub. L. 114–322, title I, § 1161
,
Dec. 16, 2016
,
130 Stat. 1668
.)
cite as:
33 USC 2330a
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
Get the CustomsMobile app!