U.S Code last checked for updates: Nov 22, 2024
§ 16320.
Spallation Neutron Source
(a)
Definitions
In this section:
(1)
SING
(2)
SNS power upgrade
(3)
SNS second target station
(4)
Spallation Neutron Source Facility
(5)
Spallation Neutron Source Project
(b)
Spallation Neutron Source Project
(1)
In general
(2)
Contents
The report shall include for the Project—
(A)
a description of the achievement of milestones;
(B)
a comparison of actual costs to estimated costs; and
(C)
any changes in estimated Project costs or schedule.
(c)
Spallation Neutron Source Facility plan
(1)
In general
(2)
Plan
The operational plan shall—
(A)
include a plan for the operation of an effective scientific user program that—
(i)
is based on peer review of proposals submitted for use of the Facility;
(ii)
includes scientific and technical support to ensure that external users, including researchers based at institutions of higher education, are able to make full use of a variety of high quality scientific instruments; and
(iii)
phases in systems upgrades to ensure that the Facility remains at the forefront of international scientific endeavors in the field of the Facility throughout the operating life of the Facility;
(B)
include an ongoing program to develop new instruments that builds on the high performance neutron source and that allows neutron scattering techniques to be applied to a growing range of scientific problems and disciplines; and
(C)
address the status of and, to the maximum extent practicable, costs and schedules for—
(i)
full user mode operations of the Facility;
(ii)
instrumentation built at the Facility during the operating phase through full use of the experimental hall, including the SING;
(iii)
the SNS power upgrade; and
(iv)
the SNS second target station.
(d)
Authorization of appropriations
(1)
Spallation Neutron Source Project
There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which—
(A)
$1,192,700,000 shall be used for the costs of construction; and
(B)
$219,000,000 shall be used for other Project costs.
(2)
Spallation Neutron Source Facility
(A)
In general
Except as provided in subparagraph (B), there is authorized to be appropriated for the Spallation Neutron Source Facility for—
(i)
the SING, $75,000,000 for each of fiscal year 2007 through 2009; and
(ii)
the SNS power upgrade, $160,000,000, to remain available until expended.
(B)
Insufficient stockpiles of heavy water
(Pub. L. 109–58, title IX, § 980, Aug. 8, 2005, 119 Stat. 905.)
cite as: 42 USC 16320