U.S. CODE
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
CustomsMobile Pro
beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
SIGNUP FOR BETA
SEARCH
Toggle Dropdown
Search US Code
Search Leg. Notes
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
U.S Code last checked for updates: Jan 18, 2025
All Titles
Title 42
Chapter 149
Subchapter VI
Part B
§ 16022. Project management...
§ 16024. Nuclear Regulatory Comm...
§ 16022. Project management...
§ 16024. Nuclear Regulatory Comm...
U.S. Code
§ 16023.
Project organization
(a)
Major project elements
The Project shall consist of the following major program elements:
(1)
High-temperature hydrogen production technology development and validation.
(2)
Energy conversion technology development and validation.
(3)
Nuclear fuel development, characterization, and qualification.
(4)
Materials selection, development, testing, and qualification.
(5)
Reactor and balance-of-plant design, engineering, safety analysis, and qualification.
(b)
Project phases
The Project shall be conducted in the following phases:
(1)
First project phase
A first project phase shall be conducted to—
(A)
select and validate the appropriate technology under subsection (a)(1);
(B)
carry out enabling research, development, and demonstration activities on technologies and components under paragraphs (2) through (4) of subsection (a);
(C)
determine whether it is appropriate to combine electricity generation and hydrogen production in a single prototype nuclear reactor and plant; and
(D)
carry out initial design activities for a prototype nuclear reactor and plant, including development of design methods and safety analytical methods and studies under subsection (a)(5).
(2)
Second project phase
A second project phase shall be conducted to—
(A)
continue appropriate activities under paragraphs (1) through (5) of subsection (a);
(B)
develop, through a competitive process, a final design for the prototype nuclear reactor and plant;
(C)
apply for licenses to construct and operate the prototype nuclear reactor from the Nuclear Regulatory Commission; and
(D)
construct and start up operations of the prototype nuclear reactor and its associated hydrogen or electricity production facilities.
(c)
Project requirements
(1)
In general
The Secretary shall ensure that the Project is structured so as to maximize the technical interchange and transfer of technologies and ideas into the Project from other sources of relevant expertise, including—
(A)
the nuclear power industry, including nuclear powerplant construction firms, particularly with respect to issues associated with plant design, construction, and operational and safety issues;
(B)
the chemical processing industry, particularly with respect to issues relating to—
(i)
the use of process energy for production of hydrogen; and
(ii)
the integration of technologies developed by the Project into chemical processing environments; and
(C)
international efforts in areas related to the Project, particularly with respect to hydrogen production technologies.
(2)
International collaboration
(A)
In general
(B)
Assistance from international partners
(C)
Partner nations
(D)
Generation IV International Forum
(3)
Review by Nuclear Energy Research Advisory Committee
(A)
In general
The Nuclear Energy Research Advisory Committee of the Department (referred to in this paragraph as the “NERAC”) shall—
(i)
review all program plans for the Project and all progress under the Project on an ongoing basis; and
(ii)
ensure that important scientific, technical, safety, and program management issues receive attention in the Project and by the Secretary.
(B)
Additional expertise
(C)
Initial review
Not later than 180 days after
August 8, 2005
, the NERAC shall—
(i)
review existing program plans for the Project in light of the recommendations of the document entitled “Design Features and Technology Uncertainties for the Next Generation Nuclear Plant,” dated
June 30, 2004
; and
(ii)
address any recommendations of the document not incorporated in program plans for the Project.
(D)
First project phase review
(E)
Transmittal of reports to Congress
(
Pub. L. 109–58, title VI, § 643
,
Aug. 8, 2005
,
119 Stat. 795
.)
cite as:
42 USC 16023
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
Get the CustomsMobile app!