U.S. CODE
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
CustomsMobile Pro
beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
SIGNUP FOR BETA
SEARCH
Toggle Dropdown
Search US Code
Search Leg. Notes
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
U.S Code last checked for updates: Nov 22, 2024
All Titles
Title 42
Chapter 162
Subchapter IV
Subchapter III - FUELS AND TECHN...
§ 18772. Data collection in the ...
Subchapter III - FUELS AND TECHN...
§ 18772. Data collection in the ...
U.S. Code
Notes
§ 18771.
Definitions
In this subchapter:
(1)
Administrator
(2)
Annual Critical Minerals Outlook
(3)
Critical mineral
(4)
Household energy burden
The term “household energy burden” means the quotient obtained by dividing—
(A)
the residential energy expenditures (as defined in section 440.3 of title 10, Code of Federal Regulations (as in effect on
November 15, 2021
)) of the applicable household; by
(B)
the annual income of that household.
(5)
Household with a high energy burden
(6)
Large manufacturing facility
The term “large manufacturing facility” means a manufacturing facility that—
(A)
annually consumes more than 35,000 megawatt-hours of electricity; or
(B)
has a peak power demand of more than 10 megawatts.
(7)
Load-serving entity
(8)
Miscellaneous electric load
The term “miscellaneous electric load” means electricity that—
(A)
is used by an appliance or device—
(i)
within a building; or
(ii)
to serve a building; and
(B)
is not used for heating, ventilation, air conditioning, lighting, water heating, or refrigeration.
(9)
Regional Transmission Organization
(10)
Rural area
(
Pub. L. 117–58, div. D, title IV, § 40411
,
Nov. 15, 2021
,
135 Stat. 1038
.)
cite as:
42 USC 18771
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
Get the CustomsMobile app!