U.S. CODE
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
CustomsMobile Pro
beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
SIGNUP FOR BETA
SEARCH
Toggle Dropdown
Search US Code
Search Leg. Notes
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
U.S Code last checked for updates: Jan 19, 2025
All Titles
Title 50
Chapter 42
Subchapter II
Part A
§ 2523b. Transferred...
§ 2524. Stockpile management pro...
§ 2523b. Transferred...
§ 2524. Stockpile management pro...
U.S. Code
Notes
§ 2523c.
Major warhead refurbishment program
In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees (as defined in U.S.C. 101(a)(16)
1
1
So in original. Probably should be “
10 U.S.C. 101
(a)(16)”.
) a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—
(1)
a full description of alternatives considered prior to the award of Phase 6.3;
(2)
a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
(3)
identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
(4)
identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
(5)
a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
(6)
a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
(
Pub. L. 113–235, div. D, title III, § 308
,
Dec. 16, 2014
,
128 Stat. 2324
.)
cite as:
50 USC 2523c