Citation
| Subject
| Applicable to subpart
| Explanation
|
---|
§ 63.1(a)(1)-(12) | General Applicability | Yes
| |
§ 63.1(b)(1)-(3) | Initial Applicability Determination | Yes | Applicability to subpart RRRR is also specified in § 63.4881.
|
§ 63.1(c)(1) | Applicability After Standard Established | Yes
| |
§ 63.1(c)(2)-(3) | Applicability of Permit Program for Area Sources | No | Area sources are not subject to subpart RRRR.
|
§ 63.1(c)(4)-(5) | Extensions and Notifications | Yes
| |
§ 63.1(c)(6) | Reclassification | Yes
| |
§ 63.1(e) | Applicability of Permit Program Before Relevant Standard is Set | Yes
| |
§ 63.2 | Definitions | Yes | Additional definitions are specified in § 63.4981.
|
§ 63.3(a)-(c) | Units and Abbreviations | Yes
| |
§ 63.4(a)(1)-(5) | Prohibited Activities | Yes
| |
§ 63.4(b)-(c) | Circumvention/Severability | Yes
| |
§ 63.5(a) | Construction/Reconstruction | Yes
| |
§ 63.5(b)(1)-(6) | Requirements for Existing, Newly Constructed, and Reconstructed Sources | Yes
| |
§ 63.5(d) | Application for Approval of Construction/Reconstruction | Yes
| |
§ 63.5(e) | Approval of Construction/Reconstruction | Yes
| |
§ 63.5(f) | Approval of Construction/Reconstruction Based on Prior State Review | Yes
| |
§ 63.6(a) | Compliance With Standards and Maintenance Requirements—Applicability | Yes
| |
§ 63.6(b)(1)-(7) | Compliance Dates for New and Reconstructed Sources | Yes | Section 63.4883 specifies the compliance dates.
|
§ 63.6(c)(1)-(5) | Compliance Dates for Existing Sources | Yes | Section 63.4883 specifies the compliance dates.
|
§ 63.6(e)(1)(i) | Operation and Maintenance | Yes, before September 12, 2019. No, on and after September 12, 2019 | See § 63.4900(b) for general duty requirement.
|
§ 63.6(e)(1)(ii) | Operation and Maintenance | Yes, before September 12, 2019. No, on and after September 12, 2019
| |
§ 63.6(e)(1)(iii) | Operation and Maintenance | Yes
| |
§ 63.6(e)(3) | Startup, shutdown, and malfunction Plan (SSMP) | Yes, before September 12, 2019. No, on and after September 12, 2019
| |
§ 63.6(f)(1) | Compliance Except During Startup, Shutdown, and Malfunction | Yes, before September 12, 2019. No, on and after September 12, 2019
| |
§ 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes
| |
§ 63.6(g)(1)-(3) | Use of Alternative Standards | Yes
| |
§ 63.6(h) | Compliance With Opacity/Visible Emission Standards | No | Subpart RRRR does not establish opacity standards and does not require continuous opacity monitoring systems (COMS).
|
§ 63.6(i)(1)-(16) | Extension of Compliance | Yes
| |
§ 63.6(j) | Presidential Compliance Exemption | Yes
| |
§ 63.7(a)(1) | Performance Test Requirements—Applicability | Yes | Applies to all affected sources using an add-on control device to comply with the standards. Additional requirements for performance testing are specified in §§ 63.4963, 63.4964, and 63.4965.
|
§ 63.7(a)(2) | Performance Test Requirements—Dates | Yes | Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standards. Section 63.4960 specifies the schedule for performance test requirements that are earlier than those specified in § 63.7(a)(2).
|
§ 63.7(a)(3) | Performance Tests Required by the Administrator | Yes
| |
§ 63.7(b)-(d) | Performance Test Requirements—Notification, Quality Assurance, Facilities Necessary Safe Testing, Conditions During Test | Yes | Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards.
|
§ 63.7(e)(1) | Conduct of performance tests | Yes, before September 12, 2019. No, on and after September 12, 2019 | See § 63.4963(a).
|
§ 63.7(e)(2)-(4) | Conduct of performance tests | Yes.
| |
§ 63.7(f) | Performance Test Requirements—Use of Alternative Test Method | Yes | Applies to all test methods except those used to determine capture system efficiency.
|
§ 63.7(g)-(h) | Performance Test Requirements—Data Analysis, Recordkeeping, Reporting, Waiver of Test | Yes | Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards.
|
§ 63.8(a)(1)-(3) | Monitoring Requirements—Applicability | Yes | Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for monitoring are specified in § 63.4967.
|
§ 63.8(a)(4) | Additional Monitoring Requirements | No | Subpart RRRR does not have monitoring requirements for flares.
|
§ 63.8(b) | Conduct of Monitoring | Yes
| |
§ 63.8(c)(1) | Continuous Monitoring Systems (CMS) Operation and Maintenance | Yes, before September 12, 2019. No, on and after September 12, 2019
| |
§ 63.8(c)(2)-(3) | CMS Operation and Maintenance | Yes | Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for CMS operations and maintenance are specified in § 63.4967.
|
§ 63.8(c)(4) | CMS | No | Section 63.4967 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply.
|
§ 63.8(c)(5) | COMS | No | Subpart RRRR does not have opacity or visible emissions standards.
|
§ 63.8(c)(6) | CMS Requirements | No | Section 63.4967 specifies the requirements for monitoring systems for capture systems and add-on control devices at sources using these to comply.
|
§ 63.8(c)(7) | CMS Out-of-Control Periods | Yes
| |
§ 63.8(c)(8) | CMS Out-of-Control Periods Reporting | No | Section 63.4920 requires reporting of CMS out-of-control periods.
|
§ 63.8(d)-(e) | Quality Control Program and CMS Performance Evaluation | No | Subpart RRRR does not require the use of CEMS.
|
§ 63.8(f)(1)-(5) | Use of an Alternative Monitoring Method | Yes.
| |
§ 63.8(f)(6) | Alternative to Relative Accuracy Test | No | Subpart RRRR does not require the use of CEMS.
|
§ 63.8(g)(1)-(5) | Data Reduction | No | Sections 63.4966 and 63.4967 specify monitoring data reduction.
|
§ 63.9(a)-(d) | Notification Requirements | Yes
| |
§ 63.9(e) | Notification of Performance Test | Yes | Applies only to capture system and add-on control device performance tests at sources using these to comply with the standards.
|
§ 63.9(f) | Notification of Visible Emissions/Opacity Test | No | Subpart RRRR does not have opacity or visible emission standards.
|
§ 63.9(g)(1)-(3) | Additional Notifications When Using CMS | No | Subpart RRRR does not require the use of CEMS.
|
§ 63.9(h) | Notification of Compliance Status | Yes | Section 63.4910 specifies the dates for submitting the notification of compliance status.
|
§ 63.9(i) | Adjustment of Submittal Deadlines | Yes
| |
§ 63.9(j) | Change in Previous Information | Yes
| |
§ 63.9(k) | Electronic reporting procedures | Yes | Only as specified in § 63.9(j).
|
§ 63.10(a) | Recordkeeping/Reporting—Applicability and General Information | Yes
| |
§ 63.10(b)(1) | General Recordkeeping Requirements | Yes | Additional requirements are specified in §§ 63.4930 and 63.4931.
|
§ 63.10(b)(2)(i) | Recordkeeping of Occurrence and Duration of Startups and Shutdowns | Yes, before September 12, 2019. No, on and after September 12, 2019 | See § 63.4930(j).
|
§ 63.10(b)(2)(ii) | Recordkeeping of Failures to Meet Standards | Yes, before September 12, 2019. No, on and after September 12, 2019 | See § 63.4930(j).
|
§ 63.10(b)(2)(iii) | Recordkeeping Relevant to Maintenance of Air Pollution Control and Monitoring Equipment | Yes
| |
§ 63.10(b)(2)(iv)- (v) | Actions Taken to Minimize Emissions During SSM | Yes, before September 12, 2019.
No, on and after September 12, 2019 | See § 63.4930(j)(4) for a record of actions taken to minimize emissions during a deviation from the standard.
|
§ 63.10(b)(2)(vi) | Recordkeeping for CMS malfunctions | Yes, before September 12, 2019. No, on and after September 12, 2019 | See § 63.4930(j) for records of periods of deviation from the standard, including instances where a CMS is inoperative or out-of-control.
|
§ 63.10(b)(2)(vii)-(xi) | Records | Yes
| |
§ 63.10(b)(2)(xii) | Records | Yes
| |
§ 63.10(b)(2)(xiii) | | No | Subpart RRRR does not require the use of CEMS.
|
§ 63.10(b)(2)(xiv) | | Yes
| |
§ 63.10(b)(3) | Recordkeeping Requirements for Applicability Determinations | Yes
| |
§ 63.10(c)(1)-(6) | Additional Recordkeeping Requirements for Sources with CMS | Yes
| |
§ 63.10(c)(7)-(8) | Additional Recordkeeping Requirements for Sources with CMS | No | See § 63.4930(j)(1) for records of periods of deviation from the standard, including instances where a CMS is inoperative or out-of-control.
|
§ 63.10(c)(10)-(14) | Additional Recordkeeping Requirements for Sources with CMS | Yes
| |
§ 63.10(c)(15) | Records Regarding the SSMP | Yes, before September 12, 2019. No, on and after September 12, 2019
| |
§ 63.10(d)(1) | General Reporting Requirements | Yes | Additional requirements are specified in § 63.4920.
|
§ 63.10(d)(2) | Report of Performance Test Results | Yes | Additional requirements are specified in § 63.4920(b).
|
§ 63.10(d)(3) | Reporting Opacity or Visible Emissions Observations | No | Subpart RRRR does not require opacity or visible emissions observations.
|
§ 63.10(d)(4) | Progress Reports for Sources With Compliance Extensions | Yes
| |
§ 63.10(d)(5) | Startup, Shutdown, and Malfunction Reports | Yes, before September 12, 2019. No, on and after September 12, 2019 | See § 63.4920(a)(7).
|
§ 63.10(e)(1)-(2) | Additional CMS Reports | No | Subpart RRRR does not require the use of CEMS.
|
§ 63.10(e)(3) | Excess Emissions/CMS Performance Reports | No | Section 63.4920(a) specifies the contents of periodic compliance reports.
|
§ 63.10(e)(4) | COMS Data Reports | No | Subpart RRRR does not specify requirements for opacity or COMS.
|
§ 63.10(f) | Recordkeeping/Reporting Waiver | Yes
| |
§ 63.11 | Control Device Requirements/Flares | No | Subpart RRRR does not specify use of flares for compliance.
|
§ 63.12 | State Authority and Delegations | Yes
| |
§ 63.13 | Addresses | Yes
| |
§ 63.14 | Incorporation by Reference | Yes
| |
§ 63.15 | Availability of Information/Confidentiality | Yes | |