Citation
| Subject
| Applies to subpart IIIII
| Explanation
|
---|
§ 63.1 | Applicability | Yes
| |
§ 63.2 | Definitions | Yes
| |
§ 63.3 | Units and Abbreviations | Yes
| |
§ 63.4 | Prohibited Activities | Yes
| |
§ 63.5 | Construction/Reconstruction | Yes
| |
§ 63.6(a)-(g), (i), (j), except for (e)(1)(i) and (ii), (e)(3), and (f)(1) | Compliance with Standards and Maintenance Requirements | Yes
| |
§ 63.6(e)(1)(i) and (ii), (e)(3), and (f)(1) | SSM Requirements | Yes | Only applies until the date specified in § 63.8186(a)(3).
|
§ 63.6(h) | Compliance with Opacity and Visible Emission Standards | No | Subpart IIIII does not have opacity and visible emission standards.
|
§ 63.7(a)-(h), except for (a)(2) and (e)(1) | Performance Testing Requirements | Yes | Subpart IIIII specifies additional requirements related to site-specific test plans and the conduct of performance tests.
|
§ 63.7(a)(2) | Applicability and Performance Test Dates | No | Subpart IIIII requires the performance test to be performed on the compliance date.
|
§ 63.7(e)(1) | Performance Test Conditions | No | See § 63.8232(a).
|
§ 63.8(a)(1), (a)(3); (b); (c)(1)(ii), (2)-(4), (6)-(8); (d)(1)-(2); (e); and (f)(1)-(5) | Monitoring Requirements | Yes | Only applies for CEMS, except Subpart IIIII specifies how and when the performance evaluation results are reported.
|
§ 63.8(a)(2) | Continuous Monitoring System (CMS) Requirements | No | Subpart IIIII requires a site-specific monitoring plan in lieu of a promulgated performance specification for a mercury concentration CMS.
|
§ 63.8(a)(4) | Additional Monitoring Requirements for Control Devices in § 63.11 | No | Subpart IIIII does not require flares.
|
§ 63.8(c)(1)(i) and (iii) | CMS Operation and SSM Plan | Yes | Only applies until the date specified in § 63.8186(a)(3).
|
§ 63.8(c)(5) | COMS Minimum Procedures | No | Subpart IIIII does not have opacity and visible emission standards.
|
§ 63.8(d)(3) | Written Procedures for CMS | No | See § 63.8242(a)(3)(v).
|
§ 63.8(f)(6) | Alternative to Relative Accuracy Test | No | Subpart IIIII does not require CEMS.
|
§ 63.8(g) | Data Reduction | No | Subpart IIIII specifies mercury concentration CMS data reduction requirements.
|
§ 63.9(a)-(e), (g)-(j) | Notification Requirements | Yes
| |
§ 63.9(f) | Notification of VE/Opacity Test | No | Subpart IIIII does not have opacity and visible emission standards.
|
§ 63.9(k) | Electronic reporting procedures | Yes | Only as specified in § 63.9(j).
|
§ 63.10(a); (b)(1); (b)(2)(vi)-(xii), (xiv); (b)(3); (c)(1)-(14); (d)(1), (4); (e); (f) | Recordkeeping/Reporting | Yes
| |
§ 63.10(b)(2)(i)-(v) | Recordkeeping/Reporting Associated with Startup, Shutdown, and Malfunctions | Yes | Only applies until the date specified in § 63.8186(a)(3).
|
§ 63.10(b)(2)(xiii) | CMS Records for RATA Alternative | No | Subpart IIIII does not require CEMS.
|
§ 63.10(c)(15) | Use of SSM Plan | Yes | Only applies until the date specified in § 63.8186(a)(3).
|
§ 63.10(d)(2) | Performance Test Results | No | This subpart at 63.8232(g) specifies how and when the performance test results are reported electronically.
|
§ 63.10(d)(3) | Reporting Opacity or VE Observations | No | Subpart IIIII does not have opacity and visible emission standards.
|
§ 63.10(d)(5) | Startup, Shutdown, and Malfunction Reports | No
| |
§ 63.10(e)(2)(i) | CEM Reporting | Yes | Except this subpart specifies how and when the performance evaluation results are reported.
|
§ 63.11 | Flares | No | Subpart IIIII does not require flares.
|
§ 63.12 | Delegation | Yes
| |
§ 63.13 | Addresses | Yes
| |
§ 63.14 | Incorporation by Reference | Yes
| |
§ 63.15 | Availability of Information | Yes | |