Citation
| Subject
| Applicable to subpart PPPPP
| Explanation
|
---|
§ 63.1(a)(1)-(12) | General Applicability | Yes
| |
§ 63.1(b)(1)-(3) | Initial Applicability Determination | Yes | Applicability to subpart PPPPP is also specified in § 63.9285.
|
§ 63.1(c)(1) | Applicability After Standard Established | Yes
| |
§ 63.1(c)(2) | Applicability of Permit Program for Area Sources | No | Area sources are not subject to subpart PPPPP.
|
§ 63.1(c)(5) | Notifications | Yes
| |
§ 63.1(c)(6) | Applicability | Reclassification | Yes.
|
§ 63.1(d) | [Reserved]
| | |
§ 63.1(e) | Applicability of Permit Program Before Relevant Standard is Set | Yes
| |
§ 63.2 | Definitions | Yes | Additional definitions are specified in § 63.9375.
|
§ 63.3 | Units and Abbreviations | Yes
| |
§ 63.4 | Prohibited Activities and Circumvention | Yes
| |
§ 63.5(a) | Construction/Reconstruction | Yes
| |
§ 63.5(b) | Requirements for Existing, Newly Constructed, and Reconstructed Sources | Yes
| |
§ 63.5(d) | Application for Approval of Construction/Reconstruction | Yes
| |
§ 63.5(e) | Approval of Construction/Reconstruction | Yes
| |
§ 63.5(f) | Approval of Construction/Reconstruction based on Prior State Review | Yes
| |
§ 63.6(a) | Compliance With Standards and Maintenance Requirements-Applicability | Yes
| |
§ 63.6(b)(1)-(7) | Compliance Dates for New and Reconstructed Sources | Yes | § 63.9295 specifies the compliance dates.
|
§ 63.6(c)(1)-(2) | Compliance Dates for Existing Sources | No | Subpart PPPPP does not establish standards for existing sources.
|
§ 63.6(c)(5) | Compliance Dates for Existing Sources | Yes | § 63.9295(b) specifies the compliance date if a new or reconstructed area source becomes a major source.
|
§ 63.6(e)(1)(i) | Operation and Maintenance | Yes before December 1, 2020. No on and after December 1, 2020 | See § 63.9305 for general duty requirement.
|
§ 63.6(e)(1)(ii) | Operation and Maintenance | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.6(e)(1)(iii) | Operation and Maintenance | Yes
| |
§ 63.6(e)(3) | SSM Plan | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.6(f)(1) | Compliance Except During SSM | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes
| |
§ 63.6(g)(1)-(3) | Use of Alternative Standards | Yes
| |
§ 63.6(h) | Compliance With Opacity/Visible Emission Standards | No | Subpart PPPPP does not establish opacity standards and does require continuous opacity monitoring systems (COMS).
|
§ 63.6(i)(1)-(16) | Extension of Compliance | No | Compliance extension provisions apply to existing sources which do not have emission limitations in subpart PPPPP.
|
§ 63.6(j) | Presidential Compliance Exemption | Yes
| |
§ 63.7(a)(1)-(2) | Performance Test Dates | Yes
| |
§ 63.7(a)(3) | Performance Test Required By the Administrator | Yes
| |
§ 63.7(b)-(d) | Performance Test Requirements-Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During Testing | Yes
| |
§ 63.7(e)(1) | Conditions for Conducting Performance Tests | Yes before December 1, 2020. No, see § 63.9321, on and after December 1, 2020
| |
§ 63.7(e)(2)-(4) | Conduct of Performance Tests | Yes
| |
§ 63.7(f) | Alternative Test Methods | Yes
| |
§ 63.7(g)-(h) | Performance Testing Requirements-Data Analysis, Recordkeeping, Reporting, Waiver of Test | Yes
| |
§ 63.8(a)(1)-(2) | Monitoring Requirements—Applicability | Yes | Subpart PPPPP contains specific requirement for monitoring at § 63.9325.
|
§ 63.8(a)(4) | Additional Monitoring Requirements | No | Subpart PPPPP does not have monitoring requirement for flares.
|
§ 63.8(b) | Conduct of Monitoring | Yes
| |
§ 63.8(c)(1) | Continuous Monitoring System (CMS) Operation and Maintenance | Yes
| |
§ 63.8(c)(1)(i) | General Duty to Minimize Emissions and CMS Operation | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.8(c)(1)(ii) | Operation and Maintenance of CMS | Yes
| |
§ 63.8(c)(1)(iii) | Requirement to Develop SSM Plan for CMS | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.8(c)(2)-(3) | Monitoring System Installation | Yes
| |
§ 63.8(c)(4) | CMS | No | § 63.9335(a) and (b) specifies the requirements.
|
§ 63.8(c)(5) | COMS | No | Subpart PPPPP does not have opacity or VE standards.
|
§ 63.8(c)(6)-(8) | CMS Requirements | Yes | Except that subpart PPPPP does not require COMS.
|
§ 63.8(d)(1)-(2) | CMS Quality Control | Yes
| |
§ 63.8(d)(3) | CMS Quality Control | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.8(e) | CMS Performance | Yes | Except for § 63.8(e)(5)(ii) which applies to COMS.
|
§ 63.8(f)(1)-(5) | Alternative Monitoring Method | Yes
| |
§ 63.8(f)(6) | Alternative to Relative Accuracy Test | Yes
| |
§ 63.8(g) | Data Reduction | Yes before December 1, 2020. No on and after December 1, 2020 | §§ 63.9335 and 63.9340 specify monitoring data reduction.
|
§ 63.9(a)-(b) | Notification Requirements | Yes
| |
§ 63.9(c) | Request for Compliance Extension | No | Compliance extension to not apply to new or reconstructed sources.
|
§ 63.9(d) | Notification of Special Compliance Requirements for New Sources | Yes
| |
§ 63.9(e) | Notification of Performance Test | No | Subpart PPPPP does not require performance testing.
|
§ 63.9(f) | Notification of Opacity/VE test | No | Subpart PPPPP does not have opacity/VE standards.
|
§ 63.9(g)(1) | Additional Notifications When Using CMS | Yes
| |
§ 63.9(g)(2) | Additional Notifications When Using CMS | No | Subpart PPPPP does not have opacity/VE standards.
|
§ 63.9(g)(3) | Additional Notifications When Using CMS | Yes
| |
§ 63.9(h) | Notification of Compliance Status | Yes
| |
§ 63.9(i) | Adjustment of Submittal Deadlines | Yes
| |
§ 63.9(j) | Change in Previous Information | Yes
| |
§ 63.9(k) | Notifications | Electronic reporting procedures | Yes, only as specified in § 63.9(j).
|
§ 63.10(a) | Recordkeeping/Reporting | Yes
| |
§ 63.10(b)(1) | General Recordkeeping Requirements | Yes
| |
§ 63.10(b)(2)(i) | Recordkeeping of Occurrence and Duration of Startups and Shutdowns | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.10(b)(2)(ii) | Recordkeeping of Occurrence and Duration of Malfunctions | Yes before December 1, 2020. No on and after December 1, 2020 | See § 63.9355 for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
|
§ 63.10(b)(2)(iii) | Recordkeeping of Maintenance on Controls and Monitoring Equipment | Yes
| |
§ 63.10(b)(2)(iv)-(v) | Actions Taken to Minimize Emissions During SSM | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.10(b)(2)(vi)-(xi) | CMS Records | Yes
| |
§ 63.10(b)(2)(xii) | Records | Yes
| |
§ 63.10(b)(2)(xiii) | Records | Yes
| |
§ 63.10(b)(2)(xiv) | Records | Yes
| |
§ 63.10(b)(3) | Recordkeeping for Applicability Determinations | Yes
| |
§ 63.10(c)(1)-(6), (9)-(14) | Additional Recordkeeping for CMS | Yes
| |
§ 63.10(c)(7)-(8) | Records of Excess Emissions and Parameter Monitoring Exceedances for CMS | No | Specific language is located at § 63.9355 of subpart PPPPP.
|
§ 63.10(c)(15) | Records Regarding the SSM Plan | Yes before December 1, 2020. No on and after December 1, 2020
| |
§ 63.10(d)(1) | General Reporting Requirements | Yes
| |
§ 63.10(d)(2) | Report of Performance Test Results | Yes
| |
§ 63.10(d)(3) | Reporting of Opacity or VE Observations | No | Subpart PPPPP does not have opacity/VE standards.
|
§ 63.10(d)(4) | Progress Reports for Sources with Compliance Extensions | No | Compliance extensions do not apply to new or reconstructed sources.
|
§ 63.10(d)(5) | SSM Reports | Yes before December 1, 2020. No on and after December 1, 2020 | On and after December 1, 2020, see § 63.9350 for malfunction reporting requirements.
|
§ 63.10(e)(1) and (2)(i) | Additional CMS Reports | Yes
| |
§ 63.10(e)(2)(ii) | Additional CMS Reports | No | Subpart PPPPP does not require COMS.
|
§ 63.10(e)(3) | Excess Emissions/CMS Performance Reports | No | Specific language in located in § 63.9350 of subpart PPPPP.
|
§ 63.10(e)(4) | COMS Data Reports | No | Subpart PPPPP does not require COMS.
|
§ 63.10(f) | Waiver for Recordkeeping/Reporting | Yes
| |
§ 63.11 | Control Device Requirements/Flares | No | Subpart PPPPP does not specify use of flares for compliance.
|
§ 63.12 | State Authority and Delegations | Yes
| |
§ 63.13 | Addresses | Yes
| |
§ 63.14 | Incorporation by Reference | Yes | ASTM D 6522-00 and ANSI/ASME PTC 19.10-1981 (incorporated by reference—See § 63.14).
|
§ 63.15 | Availability of Information/Confidentiality | Yes | |