Regulations last checked for updates: Nov 22, 2024

Title 40 - Protection of Environment last revised: Nov 20, 2024
Appendix - Table 1 to Subpart QQQQQQ of Part 63—Applicability of General Provisions to Subpart QQQQQQ

As required in § 63.11432, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.

Citation Subject Applies to
subpart
QQQQQQ?
Explanation
63.1(a)(1)-(4)General applicability of the General ProvisionsYes
63.1(a)(5)ReservedNo
63.1(a)(6)General applicability of the General ProvisionsYes
63.1(a)(7)-(9)ReservedNo
63.1(a)(10)-(12)General applicability of the General ProvisionsYes
63.1(b)(1)Initial applicability determinationYes
63.1(b)(2)ReservedNo
63.1(b)(3)Record of applicability determinationYes
63.1(c)(1)-(2)Applicability of subpart A of this part after a relevant standard has been setYes
63.1(c)(3)-(4)ReservedNo
63.1(c)(5)Notification requirements for an area source that increases HAP emissions to major source levelsYes
63.1(c)(6)ReclassificationYes
63.1(d)ReservedNo
63.1(e)Applicability of permit program before a relevant standard has been setYes
63.2DefinitionsYes
63.3Units and abbreviationsYes
63.4Prohibited activities and circumventionYes
63.5(a)(1)Applicability of preconstruction review requirementsNo
63.5(a)(2)Applicability of notification requirementsYes
63.5(b)(1)Requirements for newly constructed and reconstructed sourcesYes
63.5(b)(2)ReservedNo
63.5(b)(3)Required preconstruction approval required for major source construction and reconstructionNoSubpart QQQQQQ does not regulate major sources.
63.5(b)(4)Notification requirements for construction or reconstruction of area sourcesYes
63.5(b)(5)ReservedNo
63.5(b)(6)Added equipment (or a process change) must be considered part of the affected source and subject to all provisions in the relevant standardsYes
63.5(c)ReservedNo
63.5(d)Application for approval of construction or reconstructionNoSubpart QQQQQQ does not require an application for construction or reconstruction.
63.5(e)Approval of construction or reconstructionNoSubpart QQQQQQ does not require application approval before construction or reconstruction.
63.5(f)Approval of construction or reconstruction based on prior State preconstruction reviewNoSubpart QQQQQQ does not require approval of construction or reconstruction based on prior State preconstruction review.
63.6(a)Compliance with standards and maintenance requirementsYes
63.6(b)(1)-(5)Compliance dates for new and reconstructed sourcesYes
63(b)(6)ReservedNo
63(b)(7)Compliance dates for new and reconstructed sourcesYes
63.6(c)(1)-(2)Compliance dates for existing sourcesYes
63.6(c)(3)-(4)ReservedNo
63.6(c)(5)Compliance dates for existing sourcesYes
63.6(d)ReservedNo
63.6(e)(1)Operation and maintenance requirementsYes
63.6(e)(2)ReservedNo
63.6(e)(3)(i)Startup, shutdown, and malfunction planNoSubpart QQQQQQ does not require a startup, shutdown, and malfunction plan.
63.6(e)(3)(ii)ReservedNo
63.6(e)(3)(iii)-(ix)Startup, shutdown, and malfunction planNoSubpart QQQQQQ does not require a startup, shutdown, and malfunction plan.
63.6(f)Compliance with nonopacity emission standardsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(g)Use of an alternative nonopacity emission standardNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(h)(1)Compliance with opacity and visible emissions standardsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(h)(2)(i)Compliance with opacity and visible emissions standardsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(h)(2)(ii)ReservedNo
63.6(h)(2)(iii)Compliance with opacity and visible emissions standardsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(h)(3)ReservedNo
63.6(h)(4)Notification of opacity or visible emission observationsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6 (h)(5)(i)-(iii)Conduct of opacity or visible emission observationsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(h)(5)(iv)ReservedNo
63.6(h)(5)(v)Conduct of opacity or visible emission observationsNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(h)(6)-(9)Availability of records and use of continuous opacity monitoring systemNoSubpart QQQQQQ does not contain emission or opacity limits.
63.6(i)Extension of compliance with emissions standardsYes
63.6(j)Exemption from compliance with emissions standardsYes
63.7Performance Testing RequirementsNoSubpart QQQQQQ does not require performance tests.
63.8(a)(1)-(2)Applicability of monitoring requirementsNoSubpart QQQQQQ does not require monitoring of emissions.
63.8(a)(3)ReservedNo
63.8(a)(4)Applicability of monitoring requirementsNoSubpart QQQQQQ does not require monitoring of emissions.
63.8(b)-(g)Conduct of monitoringNoSubpart QQQQQQ does not require monitoring of emissions.
63.9(a)Applicability and general information for notification requirementsYes
63.9(b)(1)-(2)Initial notificationsYes
63.9(b)(3)ReservedNo
63.9(b)(4)-(5)Initial notificationsYes
63.9(c)-(d)Extension of compliance and special compliance requirementsYes
63.9(e), (f), (g)Notification of performance test, opacity and visible emission observation, and requirements for sources with continuous monitoring systemsNoSubpart QQQQQQ does not require monitoring of emissions.
63.9(h)(1)-(3)Notification of compliance statusYes
63.9(h)(4)ReservedNo
63.9(h)(5)-(6)Notification of compliance statusYes
63.9(i)-(j)Adjustment to time periods or postmark deadlines for submittal and review of required communications, and change in information already providedYes
63.9(k)Electronic submission of notifications and reportsNoSubpart QQQQQQ does not require electronic reporting.
63.10(a)-(b)Recordkeeping and reporting requirement applicability and general informationNoSubpart QQQQQQ establishes requirements for a report of deviations within 30 days.
63.10(c)(1)Additional recordkeeping requirements for sources with continuous monitoring systemsNoSubpart QQQQQQ does not require the use of continuous monitoring systems.
63.10(c)(2)-(4)ReservedNo
63.10(c)(5)-(8)Additional recordkeeping requirements for sources with continuous monitoring systemsNoSubpart QQQQQQ does not require the use of continuous monitoring systems.
63.10(c)(9)ReservedNo
63.10(c)(10)-(15)Additional recordkeeping requirements for sources with continuous monitoring systemsNoSubpart QQQQQQ does not require the use of continuous monitoring systems.
63.10(d)-(f)General reporting requirements, additional requirements for sources with continuous monitoring systems, and waiver of recordkeeping or reporting requirementsNoSubpart QQQQQQ establishes requirements for a report of deviations within 30 days.
63.11Control device requirements for flares and work practice requirements for monitoring leaksNoSubpart QQQQQQ does not require flares and does not require monitoring for leaks.
63.12State authorities and delegationsYes
63.13Addresses of state air pollution control agencies and EPA Regional OfficesYes
63.14Incorporations by ReferenceYes
63.15Availability of information and confidentialityYes
63.16Requirements for Performance Track member facilitiesYes
[88 FR 14288, Mar. 8, 2023]
authority: 42 U.S.C. 7401
source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.