Citation
| Summary of requirement
| Am I subject to this requirement?
| Explanations
|
---|
§ 63.1(a)(1)-(4) | Applicability | Yes
| |
§ 63.1(a)(5) | [Reserved] | No
| |
§ 63.1(a)(6) | Applicability | Yes
| |
§ 63.1(a)(7)-(9) | [Reserved] | No
| |
§ 63.1(a)(10)-(14) | Applicability | Yes
| |
§ 63.1(b)(1) | Initial Applicability Determination | Yes
| |
§ 63.1(b)(2) | [Reserved] | No
| |
§ 63.1(b)(3) | Initial Applicability Determination | Yes
| |
§ 63.1(c)(1)-(2) | Applicability After Standard Established, Permit Requirements | Yes
| |
§ 63.1(c)(3)-(4) | [Reserved] | No
| |
§ 63.1(c)(5) | Area Source Becomes Major | Yes
| |
§ 63.1(c)(6) | Reclassification | Yes
| |
§ 63.1(d) | [Reserved] | No
| |
§ 63.1(e) | Equivalency of Permit Limits | Yes
| |
§ 63.2 | Definitions | Yes
| |
§ 63.3(a)-(c) | Units and Abbreviations | Yes
| |
§ 63.4(a)(1)-(2) | Prohibited Activities | Yes
| |
§ 63.4(a)(3)-(5) | [Reserved] | No
| |
§ 63.4(b)-(c) | Circumvention, Fragmentation | Yes
| |
§ 63.5(a)(1)-(2) | Construction/Reconstruction, Applicability | Yes
| |
§ 63.5(b)(1) | Construction/Reconstruction, Applicability | Yes
| |
§ 63.5(b)(2) | [Reserved] | No
| |
§ 63.5(b)(3)-(4) | Construction/Reconstruction, Applicability | Yes
| |
§ 63.5(b)(5) | [Reserved] | No
| |
§ 63.5(b)(6) | Applicability | Yes
| |
§ 63.5(c) | [Reserved] | No
| |
§ 63.5(d)(1)-(4) | Application for Approval of Construction or Reconstruction | Yes
| |
§ 63.5(e) | Approval of Construction or Reconstruction | Yes
| |
§ 63.5(f) | Approval Based on State Review | Yes
| |
§ 63.6(a) | Compliance with Standards and Maintenance Requirements | Yes
| |
§ 63.6(b)(1)-(5) | Compliance Dates for New/Reconstructed Sources | Yes
| |
§ 63.6(b)(6) | [Reserved] | No
| |
§ 63.6(b)(7) | Compliance Dates for New/Reconstructed Sources | Yes
| |
§ 63.6(c)(1)-(2) | Compliance Dates for Existing Sources | Yes
| |
§ 63.6(c)(3)-(4) | [Reserved] | No
| |
§ 63.6(c)(5) | Compliance Dates for Existing Sources | Yes
| |
§ 63.6(d) | [Reserved] | No
| |
§ 63.6(e)(1)(i) | Operation and Maintenance Requirements—General Duty to Minimize Emissions | Yes, on or before the compliance date specified in § 63.9600(a). No, after the compliance date specified in § 63.9600(a) | See § 63.9600(a) for general duty requirement.
|
§ 63.6(e)(1)(ii) | Operation and Maintenance Requirements—Requirement to Correct Malfunction as Soon as Possible | No
| |
§ 63.6(e)(1)(iii) | Operation and Maintenance Requirements—Enforceability | Yes
| |
§ 63.6(e)(2) | [Reserved] | No
| |
§ 63.6(e)(3) | Startup, Shutdown, Malfunction (SSM) Plan | Yes, on or before the compliance date specified in § 63.9610(c). No, after the compliance date specified in § 63.9610(c)
| |
§ 63.6(f)(1) | SSM exemption | No | See § 63.9600(a).
|
§ 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes
| |
§ 63.6(g)(1)-(3) | Alternative Nonopacity Standard | Yes
| |
§ 63.6(h), except (h)(1) | Compliance with Opacity and Visible Emission (VE) Standards | No | Opacity limits in subpart RRRRR are established as part of performance testing in order to set operating limits for ESPs.
|
§ 63.6(h)(1) | Compliance except during SSM | No | See § 63.9600(a).
|
§ 63.6(i)(1)-(14) | Extension of Compliance | Yes
| |
§ 63.6(i)(15) | [Reserved] | No
| |
§ 63.6(i)(16) | Extension of Compliance | Yes
| |
§ 63.6(j) | Presidential Compliance Exemption | Yes
| |
§ 63.7(a)(1)-(2) | Applicability and Performance Test Dates | No | Subpart RRRRR specifies performance test applicability and dates.
|
§ 63.7(a)(3)-(4) | Performance Testing Requirements | Yes
| |
§ 63.7(b) | Notification | Yes
| |
§ 63.7(c) | Quality Assurance/Test Plan | Yes
| |
§ 63.7(d) | Testing Facilities | Yes
| |
§ 63.7(e)(1) | Conduct of Performance Tests | No | See § 63.9621.
|
§ 63.7(e)(2)-(4) | Conduct of Performance Tests | Yes
| |
§ 63.7(f) | Alternative Test Method | Yes
| |
§ 63.7(g) | Data Analysis | Yes | Except this subpart specifies how and when the performance test results are reported.
|
§ 63.7(h) | Waiver of Tests | Yes
| |
§ 63.8(a)(1)-(2) | Monitoring Requirements | Yes
| |
§ 63.8(a)(3) | [Reserved] | No
| |
§ 63.8(a)(4) | Additional Monitoring Requirements for Control Devices in § 63.11 | No | Subpart RRRRR does not require flares.
|
§ 63.8(b)(1)-(3) | Conduct of Monitoring | Yes
| |
§ 63.8(c)(1)(i) | Operation and Maintenance of CMS | Yes, on or before the compliance date specified in § 63.9632(b)(4). No, after the compliance date specified in § 63.9632(b)(4) | See § 63.9632 for operation and maintenance requirements for monitoring. See § 63.9600(a) for general duty requirement.
|
§ 63.8(c)(1)(ii) | Spare parts for CMS Equipment | Yes
| |
§ 63.8(c)(1)(iii) | SSM Plan for CMS | Yes, on or before the compliance date specified in § 63.9632(b)(4). No, after the compliance date specified in § 63.9632(b)(4)
| |
§ 63.8(c)(2)-(3) | CMS Operation/Maintenance | Yes
| |
§ 63.8(c)(4) | Frequency of Operation for CMS | No | Subpart RRRRR specifies requirements for operation of CMS.
|
§ 63.8(c)(5)-(8) | CMS Requirements | Yes | CMS requirements in § 63.8(c)(5) and (6) apply only to COMS for dry ESPs.
|
§ 63.8(d)(1)-(2) | Monitoring Quality Control | Yes
| |
§ 63.8(d)(3) | Monitoring Quality Control | No | See § 63.9632(b)(5).
|
§ 63.8(e) | Performance Evaluation for CMS | Yes
| |
§ 63.8(f)(1)-(5) | Alternative Monitoring Method | Yes
| |
§ 63.8(f)(6) | Relative Accuracy Test Alternative (RATA) | Yes | Only if using continuous emission monitoring systems to demonstrate compliance with Table 2 to this subpart.
|
§ 63.8(g)(1)-(g)(4) | Data Reduction | Yes
| |
§ 63.8(g)(5) | Data That Cannot Be Used | No | Subpart RRRRR specifies data reduction requirements.
|
§ 63.9 | Notification Requirements | Yes | Additional notifications for CMS in § 63.9(g) apply to COMS for dry ESPs.
|
§ 63.9(k) | Electronic reporting procedures | Yes | Only as specified in § 63.9(j)
|
§ 63.10(a) | Recordkeeping and Reporting, Applicability and General Information | Yes
| |
§ 63.10(b)(1) | General Recordkeeping Requirements | Yes
| |
§ 63.10(b)(2)(i) | Records of SSM | No | See § 63.9642 for recordkeeping when there is a deviation from a standard.
|
§ 63.10(b)(2)(ii) | Recordkeeping of Failures to Meet a Standard | No | See § 63.9642 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
|
§ 63.10(b)(2)(iii) | Maintenance Records | Yes
| |
§ 63.10(b)(2)(iv) | Actions Taken to Minimize Emissions During SSM | No
| |
§ 63.10(b)(2)(v) | Actions Taken to Minimize Emissions During SSM | No
| |
§ 63.10(b)(2)(vi) | Recordkeeping for CMS Malfunctions | Yes
| |
§ 63.10(b)(2)(vii)-(xii) | Recordkeeping for CMS | Yes
| |
§ 63.10(b)(2)(xiii) | Records for Relative Accuracy Test | No
| |
§ 63.10(b)(2)(xiv) | Records for Notification | Yes
| |
§ 63.10(b)(3) | Applicability Determinations | Yes
| |
§ 63.10(c)(1)-(6) | Additional Recordkeeping Requirements for Sources with CMS | Yes
| |
§ 63.10(c)(7)-(8) | Records of Excess Emissions and Parameter Monitoring Exceedances for CMS | | Subpart RRRRR specifies recordkeeping requirements.
|
§ 63.10(c)(9) | [Reserved] | No
| |
§ 63.10(c)(10)-(14) | CMS Recordkeeping | Yes
| |
§ 63.10(c)(15) | Use of SSM Plan | No
| |
§ 63.10(d)(1)-(2) | General Reporting Requirements | Yes | Except this subpart specifies how and when the performance test results are reported.
|
§ 63.10(d)(3) | Reporting opacity or VE observations | No | Subpart RRRRR does not have opacity and VE standards that require the use of EPA Method 9 of appendix A-4 to 40 CFR part 60 or EPA Method 22 of appendix A-7 to 40 CFR part 60.
|
§ 63.10(d)(5) | SSM Reports | Yes, on or before the compliance date specified in § 63.9641(b)(4). No, after the compliance date specified in § 63.9641(b)(4) | See § 63.9641 for malfunction reporting requirements.
|
§ 63.10(e) | Additional Reporting Requirements | Yes, except a breakdown of the total duration of excess emissions due to startup/shutdown in63.10(e)(3)(vi)(I) is not required and when the summary report is submitted through CEDRI, the report is not required to be titled “Summary Report-Gaseous and Opacity Excess Emission and Continuous Monitoring System Performance.” | The electronic reporting template combines the information from the summary report and excess emission report with the Subpart RRRRR compliance report.
|
§ 63.10(f) | Waiver for Recordkeeping or Reporting | Yes
| |
§ 63.11 | Control Device and Work Practice Requirements | No | Subpart RRRRR does not require flares.
|
§ 63.12(a)-(c) | State Authority and Delegations | Yes
| |
§ 63.13(a)-(c) | State/Regional Addresses | Yes
| |
§ 63.14(a)-(t) | Incorporation by Reference | Yes
| |
§ 63.15(a)-(b) | Availability of Information and Confidentiality | Yes
| |
§ 63.16 | Performance Track Provisions | Yes | |