Citation
| Subject
| Brief description
| Applies to subpart SSSSS
|
---|
§ 63.1 | Applicability | | Yes.
|
§ 63.2 | Definitions | | Yes.
|
§ 63.3 | Units and Abbreviations | | Yes.
|
§ 63.4 | Prohibited Activities | Compliance date; circumvention, severability | Yes.
|
§ 63.5 | Construction/Reconstruction | Applicability; applications; approvals | Yes.
|
§ 63.6(a) | Applicability | General Provisions (GP) apply unless compliance extension; GP apply to area sources that become major | Yes.
|
§ 63.6(b)(1)-(4) | Compliance Dates for New and Reconstructed Sources | Standards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for section 112(f) | Yes.
|
§ 63.6(b)(5) | Notification | | Yes.
|
§ 63.6(b)(6) | [Reserved]
| | |
§ 63.6(b)(7) | Compliance Dates for New and Reconstructed Area Sources That Become Major | Area sources that become major must comply with major source standards immediately upon becoming major, regardless of whether required to comply when they were area sources | Yes.
|
§ 63.6(c)(1)-(2) | Compliance Dates for Existing Sources | Comply according to date in subpart, which must be no later than 3 years after effective date; for section 112(f) standards, comply within 90 days of effective date unless compliance extension | Yes.
|
§ 63.6(c)(3)-(4) | [Reserved]
| | |
§ 63.6(c)(5) | Compliance Dates for Existing Area Sources That Become Major | Area sources that become major must comply with major source standards by date indicated in subpart or by equivalent time period (for example, 3 years) | Yes.
|
§ 63.6(d) | [Reserved]
| | |
§ 63.6(e)(1)-(2) | Operation & Maintenance | Operate to minimize emissions at all times; correct malfunctions as soon as practicable; requirements independently enforceable; information Administrator will use to determine if operation and maintenance requirements were met; see § 63.9792(b) for general duty requirement. | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.6(e)(3) | SSMP requirements | | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.6(f)(1) | Compliance Except During SSM | You must comply with emission standards at all times except during SSM | No.
|
§ 63.6(f)(2)-(3) | Methods for Determining Compliance | Compliance based on performance test, operation and maintenance plans, records, inspection | Yes.
|
§ 63.6(g)(1)-(3) | Alternative Standard | Procedures for getting an alternative standard. | Yes.
|
§ 63.6(h)(1)-(9) | Opacity/Visible Emission (VE) Standards | | Not applicable.
|
§ 63.6(i)(1)-(14) | Compliance Extension | Procedures and criteria for Administrator to grant compliance extension | Yes.
|
§ 63.6(j) | Presidential Compliance Exemption | President may exempt source category | Yes.
|
§ 63.7(a)(1)-(2) | Performance Test Dates | Dates for conducting initial performance testing and other compliance demonstrations; must conduct 180 days after first subject to rule | Yes.
|
§ 63.7(a)(3) | Section 114 Authority | Administrator may require a performance test under CAA section 114 at any time | Yes.
|
§ 63.7(b)(1) | Notification of Performance Test | Must notify Administrator 60 days before the test | Yes.
|
§ 63.7(b)(2) | Notification of Rescheduling | Must notify Administrator 5 days before scheduled date and provide rescheduled date | Yes.
|
§ 63.7(c) | Quality Assurance/Test Plan | Requirements; test plan approval procedures; performance audit requirements; internal and external QA procedures for testing | Yes.
|
§ 63.7(d) | Testing Facilities | | Yes.
|
§ 63.7(e)(1) | Conditions for Conducting Performance Tests | See § 63.9800. | No, § 63.9800 specifies requirements.
|
§ 63.7(e)(2) | Conditions for Conducting Performance Tests | Must conduct according to subpart and EPA test methods unless Administrator approves alternative | Yes.
|
§ 63.7(e)(3) | Test Run Duration | Must have three test runs of at least 1 hour each; compliance is based on arithmetic mean of three runs; conditions when data from an additional test run can be used | Yes; Yes, except where specified in § 63.9800 for batch process sources; Yes.
|
§ 63.7(f) | Alternative Test Method | | Yes.
|
§ 63.7(g) | Performance Test Data Analysis | | Yes, except this subpart specifies how and when the performance test and performance evaluation results are reported.
|
§ 63.7(h) | Waiver of Test | | Yes.
|
§ 63.8(a)(1) | Applicability of Monitoring Requirements | | Yes.
|
§ 63.8(a)(2) | Performance Specifications | Performance Specifications in appendix B of 40 CFR part 60 apply | Yes.
|
§ 63.8(a)(3) | [Reserved]
| | |
§ 63.8(a)(4) | Monitoring with Flares | | Not applicable.
|
§ 63.8(b)(1) | Monitoring | Must conduct monitoring according to standard unless Administrator approves alternative | Yes.
|
§ 63.8(b)(2)-(3) | Multiple Effluents and Multiple Monitoring Systems | Specific requirements for installing and reporting on monitoring systems | Yes.
|
§ 63.8(c)(1) | Continuous Monitoring System Operation and Maintenance | Maintenance consistent with good air pollution control practices | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.8(c)(2)-(3) | Monitoring System Installation | Must install to get representative emission and parameter measurements | Yes.
|
§ 63.8(c)(4) | CMS Requirements | | No, § 63.9808 specifies requirements.
|
§ 63.8(c)(5) | COMS Minimum Procedures | | Not applicable.
|
§ 63.8(c)(6) | CMS Requirements | | Applies only to sources required to install and operate a THC CEMS.
|
§ 63.8(c)(7)(i)(A) | CMS Requirements | | Applies only to sources required to install and operate a THC CEMS.
|
§ 63.8(c)(7)(i)(B) | CMS Requirements | | Applies only to sources required to install and operate a THC CEMS.
|
§ 63.8(c)(7)(i)(C) | CMS Requirements | | Not applicable.
|
§ 63.8(c)(7)(ii) | CMS Requirements | Corrective action required when CMS is out of control | Yes.
|
§ 63.8(c)(8) | CMS Requirements | | Yes.
|
§ 63.8(d)(1) and (2) | CMS Quality Control | | Yes.
|
§ 63.8(d)(3) | Written procedures for CMS | | No, § 63.9794(a)(8) specifies requirements.
|
§ 63.8(e) | CMS Performance Evaluation | | Applies only to sources required to install and operate a THC CEMS, except this subpart specifies how and when the performance evaluation results are reported.
|
§ 63.8(f)(1)-(5) | Alternative Monitoring Method | | Yes.
|
§ 63.8(f)(6) | Alternative to Relative Accuracy Test | | Yes.
|
§ 63.8(g) | Data Reduction | | Applies only to sources required to install and operate a THC CEMS.
|
§ 63.9(a) | Notification Requirements | | Yes.
|
§ 63.9(b)(1)-(5) | Initial Notifications | | Yes.
|
§ 63.9(c) | Request for Compliance Extension | | Yes.
|
§ 63.9(d) | Notification of Special Compliance Requirements for New Source | | Yes.
|
§ 63.9(e) | Notification of Performance Test | Notify Administrator 60 days prior | Yes.
|
§ 63.9(f) | Notification of VE/Opacity Test | | Not applicable.
|
§ 63.9(g) | Additional Notifications When Using CMS | | Applies only to sources required to install and operate a THC CEMS.
|
§ 63.9(h) | Notification of Compliance Status | | Yes.
|
§ 63.9(i) | Adjustment of Submittal Deadlines | | Yes.
|
§ 63.9(j) | Change in Previous Information | | Yes.
|
§ 63.9(k) | Notifications | Electronic reporting procedures | Yes, only as specified in § 63.9(j).
|
§ 63.10(a) | Recordkeeping/Reporting | | Yes.
|
§ 63.10(b)(1) | General Recordkeeping Requirements | | Yes.
|
§ 63.10(b)(2)(i)-(ii) | Recordkeeping of Occurrence and Duration of Startups and Shutdowns and Failures to Meet Standards | See § 63.9816 | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.10(b)(2)(iii) | Recordkeeping Relevant to Maintenance of Air Pollution Control and Monitoring Equipment | | Yes.
|
§ 63.10(b)(2)(iv)-(v) | Actions Taken to Minimize Emissions during SSM | | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.10(b)(2)(vi) | Recordkeeping for CMS Malfunctions | See § 63.9816(c)(5) | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.10(b)(2)(vii)-(xi) | Records | Measurements to demonstrate compliance with emission limitations; performance test, performance evaluation, and visible emission observation results; measurements to determine conditions of performance tests and performance evaluations | Yes.
|
§ 63.10(b)(2)(xii) | Records | Records when under waiver | Yes.
|
§ 63.10(b)(2)(xiii) | Records | Records when using alternative to relative accuracy test | Not applicable.
|
§ 63.10(b)(2)(xiv) | Records | All documentation supporting Initial Notification and Notification of Compliance Status | Yes.
|
§ 63.10(b)(3) | Records | Applicability Determinations | Yes.
|
§ 63.10(c)(1), (c)(5)-(6) | Additional Records for CMS | | Yes.
|
§ 63.10(c)(2)-(4) | Records | Additional Records for CMS | Not applicable.
|
§ 63.10(c)(7)-(8) | Records of excess emissions and parameter monitoring exceedances for CMS | § 63.9816 specifies requirements. | No.
|
§ 63.10(c)(9) | Records | Additional Records for CMS | Not applicable.
|
§ 63.10(c)(10)-(14) | Additional Records for CMS | | Yes.
|
§ 63.10(c)(15) | Records Regarding the SSMP | | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.10(d)(1) | General Reporting Requirements | Requirements for reporting | Yes.
|
§ 63.10(d)(2) | Report of Performance Test Results | When to submit to Federal or State authority | No. This subpart specifies how and when the performance test results are reported.
|
§ 63.10(d)(3) | Reporting Opacity or VE Observations | | Not applicable.
|
§ 63.10(d)(4) | Progress Reports | Must submit progress reports on schedule if under compliance extension | Yes.
|
§ 63.10(d)(5) | SSM Reports | Contents and submission See § 63.9814 (d) and (e) for malfunction reporting requirements. | Yes before May 19, 2022. No on and after May 19, 2022.
|
§ 63.10(e)(1)-(2) | Additional CMS Reports | | Applies only to sources required to install and operate a THC CEMS, except this subpart specifies how and when the performance evaluation results are reported.
|
§ 63.10(e)(3) | Reports | | No, § 63.9814 specifies requirements.
|
§ 63.10(e)(4) | Reporting COMS data | | Not applicable.
|
§ 63.10(f) | Waiver for Recordkeeping/Reporting | | Yes.
|
§ 63.11 | Flares | | Not applicable.
|
§ 63.12 | Delegation | | Yes.
|
§ 63.13 | Addresses | | Yes.
|
§ 63.14 | Incorporation by Reference | | Yes.
|
§ 63.15 | Availability of Information and Confidentiality | | Yes.
|
§ 63.16 | Performance Track Provisions | | Yes. |