Regulations last checked for updates: Nov 22, 2024

Title 40 - Protection of Environment last revised: Nov 20, 2024
Appendix - Table 10 to Subpart SSSSS of Part 63—Requirements for Reports

As stated in § 63.9814, you must comply with the requirements for reports in the following table:

You must submit a(n) . . . The report must contain . . . You must submit the report . . .
1. Compliance reportThe information in § 63.9814(c) through (f)Semiannually according to the requirements in § 63.9814(a) through (f).
2. Before May 19, 2022, immediate SSM report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent with your SSMP, on and after May 19, 2022, immediate SSM report is not requireda. Actions taken for the eventBy fax or telephone within 2 working days after starting actions inconsistent with the plan.
b. The information in § 63.10(d)(5)(ii)By letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority.
3. Before May 19, 2022, report of alternative fuel useThe information in § 63.9814(g) and items 4 and 5 of Table 9 to this subpartIf you are subject to the work practice standard specified in item 3 or 4 of Table 3 to this subpart, and you use an alternative fuel in the affected kiln, by letter within 10 working days after terminating the use of the alternative fuel.
4. Performance test reportThe information in § 63.7(g)According to the requirements of § 63.9814(h).
5. CMS performance evaluation, as required for CEMSThe information in § 63.7(g)According to the requirements of § 63.9814(i).
[86 FR 66092, Nov. 19, 2021]
authority: 42 U.S.C. 7401
source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.