Regulations last checked for updates: Nov 22, 2024

Title 40 - Protection of Environment last revised: Nov 20, 2024
Appendix - Table 3 to Subpart ZZZZZ of Part 63—Applicability of General Provisions to New and Existing Affected Sources Classified as Large Foundries

As required in § 63.10900(a), you must meet each requirement in the following table that applies to you:

Citation Subject Applies to large
foundry?
Explanation
63.1ApplicabilityYes
63.2DefinitionsYes
63.3Units and abbreviationsYes
63.4Prohibited activitiesYes
63.5Construction/reconstructionYes
63.6(a) through (d)Compliance applicability and datesYes
63.6(e)Operating and maintenance requirementsNoThis subpart specifies operating and maintenance requirements.
63.6(f)(1)Applicability of non-opacity emission standardsNoThis subpart specifies applicability of non-opacity emission standards.
63.6(f)(2) through (3)Methods and finding of compliance with non-opacity emission standardsYes
63.6(g)Use of an alternative nonopacity emission standardYes
63.6(h)(1)Applicability of opacity and visible emissions standardsNoThis subpart specifies applicability of opacity and visible emission standards.
63.6(h)(2) through (9)Methods and other requirements for opacity and visible emissions standardsYes
63.6(i) through (j)Compliance extension and Presidential compliance exemptionYes
63.7(a)(1) through (2)Applicability and performance test datesNoThis subpart specifies applicability and performance test dates.
63.7(a)(3) through (4)Administrators rights to require a performance test and force majeure provisionsYes
63.7(b) through (d)Notification of performance test, quality assurance program, and testing facilitiesYes
63.7(e)(1)Performance test conditionsNoThis subpart specifies performance test conditions.
63.7(e)(2) through (4), (f) through (h)Other performance testing requirementsYes
63.8(a)(1) through (3), (b), (c)(1)(ii), (c)(2) through (3), (c)(6) through (8), (d)(1) through (2)Monitoring requirementsYes
63.8(a)(4)Additional monitoring requirements for control devices in § 63.11No
63.8(c)(1)(i), (c)(1)(iii)Operation and maintenance of continuous monitoring systemsNoNot necessary in light of other requirements of § 63.8 that apply.
63.8(c)(4)Continuous monitoring system (CMS) requirementsNo
63.8(c)(5)Continuous opacity monitoring system (COMS) minimum proceduresNo
63.8(d)(3)Quality control programNoThis subpart specifies records that must be kept associated with site-specific performance evaluation test plan.
63.8(e), (f)(1) through (6), (g)(1) through (4)Performance evaluations and alternative monitoringYes
63.8(g)(5)Data reductionNo
63.9Notification requirementsYes.Except for opacity performance tests.
63.10(a), (b)(1), (b)(2)(xii) through (xiv), (b)(3), (d)(1) through (4), (e)(1) through (2), (f)Recordkeeping and reporting requirementsYes
63.10(b)(2)(i) through (xi)Malfunction and CMS recordsNo
63.10(c)Additional records for CMSNoThis subpart specifies records requirements.
63.10(d)(5)Periodic startup, shutdown, and malfunction reportsNo
63.10(e)(3)Excess emissions reportsNoThis subpart specifies reporting requirements.
63.10(e)(4)Reporting COMS dataNo
63.11Control device requirementsNo
63.12State authority and delegationsYes
63.13(a)Reporting to EPA regional officesYesExcept: reports and notifications required to be submitted to CEDRI meet this obligation through electronic reporting.
63.13(b) through 63.16Addresses of state air pollution control agencies. Incorporation by reference. Availability of information and confidentiality. Performance track provisionsYes
[85 FR 56105, Sept. 10, 2020]
authority: 42 U.S.C. 7401
source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.