Regulations last checked for updates: Jan 30, 2025

Title 47 - Telecommunication last revised: Jan 27, 2025
Appendix - Alphabetical Index—Part 78
A
Antenna systems78.105
Applications—
Acceptance of; public notice78.20
Amendments of78.17
Contents of78.15
Dismissal of78.21
Objections to78.22
Signing of78.16
Assignment or transfer of control78.35
Authority, Temporary78.33
Authorized bandwidth78.104
B
Bandwidth authorized78.104
C
Certificated equipment78.107
Changes in equipment78.109
Conditions for license78.27
Coordination, frequencies78.36
Cross reference to other rules78.3
D
Definitions78.5
E
Eligibility for license78.13
Emission designator78.104
Emissions; emission limitations78.103
Equal employment opportunities78.75
Equipment changes78.109
Equipment installation78.107
Equipment tests78.23
Extension of license, Temporary78.31
F
Frequency assignments78.18
Frequency coordination78.36
Frequency monitors and measurements78.113
Frequency tolerance78.111
G-H [Reserved]
I
Interference78.19
Inspection of station by FCC78.57
Installation of equipment78.107
J-K [Reserved]
L
License conditions78.27
License eligibility78.13
License extension, Temporary78.31
License period78.29
Licenses, station and operator, Posting of78.59
Lighting and maintenance of towers78.63
Limitations, Power78.101
Limits of modulation78.115
M
Maintenance and lighting of towers78.63
Modulation limits78.115
Monitors and Measurements, Frequency78.113
N [Reserved]
O
Operation by remote control78.51
Operation, Time of78.55
Operation, Unattended78.53
Operator and station licenses, Posting of78.59
Operator requirements78.61
P
Period of license78.29
Permissible service78.11
Possession of rules78.67
Posting of operator and station licenses78.59
Power limitations78.101
Purpose of Part 7878.1
Q [Reserved]
R
Records of station78.69
Remote control operation78.51
Rules in other Parts78.3
Rules, Possession of78.67
S
Service, Permissible78.11
Station and operator licenses, Posting of78.59
Station inspection by FCC78.57
Station records78.69
T
Temporary authority78.33
Temporary extension of license78.31
Tests—
Equipment78.23
Program78.25
Service78.25
Time of operation78.55
Tolerance, Frequency78.111
Towers, Lighting and maintenance78.63
Transfer of control or assignment78.35
U
Unattended operation78.53
V-Z [Reserved]
[50 FR 38537, Sept. 23, 1985, as amended at 63 FR 36606, July 7, 1998]
source: 37 FR 3292, Feb. 12, 1972, unless otherwise noted.