REGULATIONS
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
CustomsMobile Pro
beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
SIGNUP FOR BETA
SEARCH
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
Regulations last checked for updates: Nov 22, 2024
Title 30 - Mineral Resources last revised: Nov 19, 2024
All Titles
Title 30
Chapter II
Part 250
Subpart G - Subpart G—Well Operations and Equipment
BLOWOUT PREVENTER (BOP) SYSTEM REQUIREMENTS
§ 250.730 - What are the general requirements for BOP systems and system components?
§ 250.731 - What information must I submit for BOP systems and system components?
§ 250.732 - What are the independent third party requirements for BOP systems and system components?
§ 250.733 - What are the requirements for a surface BOP stack?
§ 250.734 - What are the requirements for a subsea BOP system?
§ 250.735 - What associated systems and related equipment must all BOP systems include?
§ 250.736 - What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves?
§ 250.737 - What are the BOP system testing requirements?
§ 250.738 - What must I do in certain situations involving BOP equipment or systems?
§ 250.739 - What are the BOP maintenance and inspection requirements?
RECORDS AND REPORTING
§ 250.740 - What records must I keep?
§ 250.741 - How long must I keep records?
§ 250.742 - What well records am I required to submit?
§ 250.743 - What are the well activity reporting requirements?
§ 250.744 - What are the end of operation reporting requirements?
§ 250.745 - What other well records could I be required to submit?
§ 250.746 - What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers?
COILED TUBING OPERATIONS
§ 250.750 - What are the coiled tubing requirements?
§ 250.751 - Coiled tubing testing requirements.
SNUBBING OPERATIONS
§ 250.760 - What are the snubbing requirements?
GENERAL REQUIREMENTS
§ 250.700 - What operations and equipment does this subpart cover?
§ 250.701 - May I use alternate procedures or equipment during operations?
§ 250.702 - May I obtain departures from these requirements?
§ 250.703 - What must I do to keep wells under control?
RIG REQUIREMENTS
§ 250.710 - What instructions must be given to personnel engaged in well operations?
§ 250.711 - What are the requirements for well-control drills?
§ 250.712 - What rig unit movements must I report?
§ 250.713 - What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations?
§ 250.714 - Do I have to develop a dropped objects plan?
§ 250.715 - Do I need a global positioning system (GPS) for all MODUs?
WELL OPERATIONS
§ 250.720 - When and how must I secure a well?
§ 250.721 - What are the requirements for pressure testing casing and liners?
§ 250.722 - What are the requirements for prolonged operations in a well?
§ 250.723 - What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow?
§ 250.724 - What are the real-time monitoring requirements?
authority:
30 U.S.C. 1751
,
31
.S.C. 9701,
33 U.S.C. 1321
(j)(1)(C),
43 U.S.C. 1334.
source:
76 FR 64462, Oct. 18, 2011, unless otherwise noted.
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
Get the CustomsMobile app!