Regulations last checked for updates: Nov 22, 2024

Title 40 - Protection of Environment last revised: Nov 20, 2024
Appendix - Table 9 to Subpart U of Part 63—Routine Reports Required by This Subpart
Reference Description of report Due Date
§ 63.506(b) and subpart ARefer to § 63.506(b), Table 1 of this subpart, and to subpart ARefer to subpart A.
§ 63.506(e)(3)Precompliance Report a1. Existing affected sources: December 19, 2000.
2. New affected sources: with the application for approval of construction or reconstruction.
§ 63.506(e)(4)Emissions Averaging PlanSeptember 19, 2000.
§ 63.506(e)(4)(iv)Updates to Emissions Averaging Plan120 days prior to making the change necessitating the update.
§ 63.506(e)(5)Notification of Compliance Status bWithin 150 days after the compliance date.
§ 63.506(e)(6)Periodic reportsSemiannually, no later than 60 days after the end of each 6-month period. See § 63.506(e)(6)(i) for the due date for this report.
§ 63.506(e)(6)(xi)Quarterly for reports Emissions AveragingNo later than 60 days after the end of each quarter. First report is due with the Notification of Compliance Status.
§ 63.506(e)(6)(xii)Quarterly reports upon request of the AdministratorNo later than 60 days after the end of each quarter.
§ 63.506(e)(7)(i)Storage Vessels Notification of InspectionAt least 30 days prior to the refilling of each storage vessel or the inspection of each storage vessel.
§ 63.506(e)(7)(ii)Requests for Approval of a Nominal Control Efficiency for Use in Emissions AveragingInitial submittal is due with the Emissions Averaging Plan; later submittals are made at the discretion of the owner or operator as specified in § 63.506(e)(7)(ii)(B).
§ 63.506(e)(7)(iii)Notification of Change in the Primary ProductFor notification under § 63.480(f)(3)(ii)—notification submittal date at the discretion of the owner or operator. c
For notification under § 63.480(f)(4)(ii)—within 6 months of making the determination.
§ 63.506(e)(7)(vi)Fenceline Monitoring ReportsQuarterly, no later than 45 calendar days following the end of each quarterly reporting period. See § 63.182(e) of subpart H of this part for the due date for this report.

a There may be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart.

b There will be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart.

c Note that the EPPU remains subject to this subpart until the notification under § 63.480(f)(3)(i) is made.

[66 FR 36928, July 16, 2001, as amended at 89 FR 43268, May 16, 2024]
authority: 42 U.S.C. 7401
source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.